Blair Communill Schools — Haff Storm Repairs
m
Estimated
Arbor Park
• Roofing
o Remove and Replace Existing Roofing, Flashing and Parapet Caps — Cannot recycle insulation
because it is hot mopped and fully adhered.
• Skylights Units
o Remove and Replace all 4 Skylights
• Skylight Wall Panels
o Remove and Replace all 60 Translucent Panels
Metal Siding
o Remove and Replace Metal Siding on Roof above Skylight Wall Panels
• Mechanical
• Remove and Replace (1) 16" Boiler Flue Vent Cap
• Remove and Replace (1) Exhaust Fan Cap
• Electrical I Lighting
• Remove and Replace Damaged Exterior Light Fixtures — (9) Glass Domes and (9) Pole Light
Fixtures
• Disconnect and Re- Connect Mechanical Electrical Supply
• Acoustical Ceiling Tile
o Replace all Damaged Ceiling Tile from Roof Leaks
• Drywall
o Replace all Drywall Damaged from Roof Leaks
• Painting
• Interior — Paint all replaced Drywall
• Exterior — Surfaces Damaged on the Roof and on the North & West Elevations