Loading...
a.tif i { Blair Communill Schools — Haff Storm Repairs m Estimated Arbor Park • Roofing o Remove and Replace Existing Roofing, Flashing and Parapet Caps — Cannot recycle insulation because it is hot mopped and fully adhered. • Skylights Units o Remove and Replace all 4 Skylights • Skylight Wall Panels o Remove and Replace all 60 Translucent Panels Metal Siding o Remove and Replace Metal Siding on Roof above Skylight Wall Panels • Mechanical • Remove and Replace (1) 16" Boiler Flue Vent Cap • Remove and Replace (1) Exhaust Fan Cap • Electrical I Lighting • Remove and Replace Damaged Exterior Light Fixtures — (9) Glass Domes and (9) Pole Light Fixtures • Disconnect and Re- Connect Mechanical Electrical Supply • Acoustical Ceiling Tile o Replace all Damaged Ceiling Tile from Roof Leaks • Drywall o Replace all Drywall Damaged from Roof Leaks • Painting • Interior — Paint all replaced Drywall • Exterior — Surfaces Damaged on the Roof and on the North & West Elevations i i i