d.tif i
Bla Commun Schools — Haff Storm Re .
i
E stimated 1 7� 584.
i
D eerfield le ante
• Roofing
• Remove and Replace all Existing Roofing, Flashing & Parapets. — No Insulation
Recycled because it is Hot Mopped into System
• Remove and Replace Metal Wall and Roof Panels with 24 Gauge — to match existing
profile and color. Installed to SMACNA Details.
• Glass & Glazing
o Remove and Replace (19) Translucent Panels
• Refrigeration
• Straighten and Comb Condenser Fin Surface
• Straighten Metal covers on Condensing Unit
• Replace Damaged Insulation on Suction Lines of the Walk -In Cooler & Freezer
• Mechanical
• Replace (6) Daikin Mini Split Rooftop Units
• Replace (1) Daikin Mini Split Wind Baffle Kit
• Replace (6) Condenser Coils
• Replace (1) PVC Condensate Trap
• Reinsulate (7) Suction and Liquid Line Sets
• Replace (6) Exhaust Fans
• Replace (8) Relief Hoods
• Replace (8) Fan Guards
• Repair or Replace Low Voltage Wiring on Roof
• Replace (1) 4" Vent Cap
• Replace (1) 6" Vent Cap
• Electrical / Lighting
o Disconnect and Re- Connect Mechanical Electrical Supply
• Ceiling Tile
o Replace all Ceiling Tiles Damaged from Roof Leaks
• Paint
o Repaint Surfaces on the North and West Exterior Elevations
i
i
i
i
i
i
E