w.tif i
Blair • • m H Storm Re O
Estimated •
West Elemen o _
• Roofing
o Remove and Replace Existing Roofing, Flashing and Parapet Caps — Perlite under the EPS — GAF
will not warrant Re -Roofs over Perlite because it retains moisture.
• Glass & Glazing
o Remove and Replace (17) Broken Window Panes, Including Window Tinting
• EIFS
o Remove and Replace EIFS System (Approx. 77 SF)
• Mechanical
• Replace (2) Rooftop Units
• Replace (1) 13 Ton Condensing Unit with a RTU
• Replacement of (5) Exhaust Fans
• Remove and Reinsulate (5) Suction and Liquid Line Sets
• Replacement of (7) Suction and Liquid Line Sets from Condensing Unit to Pitch Pockets
• Remove and Replace (7) Relief Hoods
• Remove and Replace (3) Goose Neck Vents
• Repair or Replace Low Voltage Wiring on Roof
• Replace Condensing Unit Only in the (7) Classroom Unit Ventilators
• Electrical / Lighting
• Remove and Replace (1) New Wall Pack Fixture
• Disconnect and Re- Connect Mechanical Electrical Supply
• Fire Alarm
o Remove and Replace (1) Horn / Strobe
• Ceiling Tile
o Replace all Ceiling Tiles Damaged from Roof Leaks
• Casework
• Replace Casework Damaged by Water including:
• Replace one 7' LF of Base, Wall Cabinets and Counter Tops in Work Room
• Replace one 5' of Base Cabinets, Wall Cabinets and Counter Tops in Staff Room — North Wall
• Replace one 9' -6" of Base Cabinets, Wall Cabinets and Counter Tops in Staff Room — South Wall
• Replace (1) Plastic Laminate Counter Top in Room #100
• Replace one 36" Plastic Laminate Storage Cabinet in Room #100
• Replace one 18' Reception Desk with 4 %2 Wall Cabinet
• Replace one 5' of Base, Uppers and Counter Tops in Nurses Area
• Replace one 30" Wall Cabinet in Nurses Area
• Replace one 12' of Base Cabinets and Counter tops in Room #101
• Replace one 6' of Storage Cabinets in Room #101
• Replace one 8'6" of Upper Cabinets in Room #101
• Flooring
• Remove and Replace Existing Carpeting
• Remove and Install 4" Vinyl Base, Transitions and Minor Floor Prep
• Ceramic Wall Tile
o Replace Daltile " Waltile" 4.25" x 4.25" Group 1 Colors on (3) Walls of two Restrooms
• Paint
o Repaint surfaces on the North and West Elevations
• Playground Equipment
• Remove and Replace (1) GameTime Alum End Cap
• Remove and Replace (1) GameTime Self Sealing Pop Rivet
• Remove and Replace (1) Brakeless Space Shuttle