Loading...
w.tif i Blair • • m H Storm Re O Estimated • West Elemen o _ • Roofing o Remove and Replace Existing Roofing, Flashing and Parapet Caps — Perlite under the EPS — GAF will not warrant Re -Roofs over Perlite because it retains moisture. • Glass & Glazing o Remove and Replace (17) Broken Window Panes, Including Window Tinting • EIFS o Remove and Replace EIFS System (Approx. 77 SF) • Mechanical • Replace (2) Rooftop Units • Replace (1) 13 Ton Condensing Unit with a RTU • Replacement of (5) Exhaust Fans • Remove and Reinsulate (5) Suction and Liquid Line Sets • Replacement of (7) Suction and Liquid Line Sets from Condensing Unit to Pitch Pockets • Remove and Replace (7) Relief Hoods • Remove and Replace (3) Goose Neck Vents • Repair or Replace Low Voltage Wiring on Roof • Replace Condensing Unit Only in the (7) Classroom Unit Ventilators • Electrical / Lighting • Remove and Replace (1) New Wall Pack Fixture • Disconnect and Re- Connect Mechanical Electrical Supply • Fire Alarm o Remove and Replace (1) Horn / Strobe • Ceiling Tile o Replace all Ceiling Tiles Damaged from Roof Leaks • Casework • Replace Casework Damaged by Water including: • Replace one 7' LF of Base, Wall Cabinets and Counter Tops in Work Room • Replace one 5' of Base Cabinets, Wall Cabinets and Counter Tops in Staff Room — North Wall • Replace one 9' -6" of Base Cabinets, Wall Cabinets and Counter Tops in Staff Room — South Wall • Replace (1) Plastic Laminate Counter Top in Room #100 • Replace one 36" Plastic Laminate Storage Cabinet in Room #100 • Replace one 18' Reception Desk with 4 %2 Wall Cabinet • Replace one 5' of Base, Uppers and Counter Tops in Nurses Area • Replace one 30" Wall Cabinet in Nurses Area • Replace one 12' of Base Cabinets and Counter tops in Room #101 • Replace one 6' of Storage Cabinets in Room #101 • Replace one 8'6" of Upper Cabinets in Room #101 • Flooring • Remove and Replace Existing Carpeting • Remove and Install 4" Vinyl Base, Transitions and Minor Floor Prep • Ceramic Wall Tile o Replace Daltile " Waltile" 4.25" x 4.25" Group 1 Colors on (3) Walls of two Restrooms • Paint o Repaint surfaces on the North and West Elevations • Playground Equipment • Remove and Replace (1) GameTime Alum End Cap • Remove and Replace (1) GameTime Self Sealing Pop Rivet • Remove and Replace (1) Brakeless Space Shuttle