Estimated
South Elementary
• Roofing
Remove and Replace Existing Roofing with Exception of the Ballasted EPDM, Flashing and
Parapet Caps — Cannot overlay EPS sections because it has an additional layer of roofing below
the EPS, Leave the existing sections with Ballasted EPDM as is until tested by third party. If
damaged is determined then it will be added back to the SOW via a Change Order.
• Glass & Glazing
• Remove and Replace (36) Broken Window Panes
• Remove and Replace (24) Storm Windows
• Remove and Replace (2) Thermo Panes
• Skylights
Remove and Replace (2) Skylights
• Metal Siding
Remove and Replace Metal Siding
• Mechanical
Remove and Replace (2) Rooftop Units
Remove and Replace (1) 13 ton Condensing Unit with RTU
Remove and Replace (2) condensing Units
Remove and Replace (7) Exhaust Fans
Remove and Reinstall 1 V2 Insulation on Suction and Liquid Line Sets
Remove and Replace (11) Suction and Liquid Line Sets from Condensing Unit to Pitch Pockets
Remove and Replace (2) Relief Hoods
Remove and Replace (4) Fan Guards
Repair or Replacement of Low Voltage Control Wiring on the Roof
Replace the Condenser Coil on the NW Corner Ground Unit
Remove and Replace the Condensing Unit Only inside the (9) Unit Ventilators (Classrooms)
• EIFS
Replace all System on the North & West Elevations
• Electrical / Lighting
• Remove and Replace (2) par Lamp Fixtures
• Remounting of Electrical Box knocked loose on Brick Fagade
• Remove and Replace (1) New Wall Pack Fixture
• Disconnect and Re- Connect Mechanical Electrical Supply
• Ceiling Tile
Replace all Ceiling Tiles Damaged from Roof Leaks
• Flooring
• Remove and Replace Existing Carpeting — Including Wrapping of the carpet in the Library "Pit"
• Remove and Install 4" Vinyl Base, Transitions and Minor Floor Prep
• Paint
Repaint surfaces on the North and West Elevations
• Playground Equipment
• Remove and Replace (1) GameTime Overhead Tree Climber
• Remove and Replace (1) GameTime Punch 2 Step Assembly