s.tif I Blair Communily Schools — Haff Storm Re j Estimated South Elementary • Roofing Remove and Replace Existing Roofing with Exception of the Ballasted EPDM, Flashing and Parapet Caps — Cannot overlay EPS sections because it has an additional layer of roofing below the EPS, Leave the existing sections with Ballasted EPDM as is until tested by third party. If damaged is determined then it will be added back to the SOW via a Change Order. • Glass & Glazing • Remove and Replace (36) Broken Window Panes • Remove and Replace (24) Storm Windows • Remove and Replace (2) Thermo Panes • Skylights Remove and Replace (2) Skylights • Metal Siding Remove and Replace Metal Siding • Mechanical Remove and Replace (2) Rooftop Units Remove and Replace (1) 13 ton Condensing Unit with RTU Remove and Replace (2) condensing Units Remove and Replace (7) Exhaust Fans Remove and Reinstall 1 V2 Insulation on Suction and Liquid Line Sets Remove and Replace (11) Suction and Liquid Line Sets from Condensing Unit to Pitch Pockets Remove and Replace (2) Relief Hoods Remove and Replace (4) Fan Guards Repair or Replacement of Low Voltage Control Wiring on the Roof Replace the Condenser Coil on the NW Corner Ground Unit Remove and Replace the Condensing Unit Only inside the (9) Unit Ventilators (Classrooms) • EIFS Replace all System on the North & West Elevations • Electrical / Lighting • Remove and Replace (2) par Lamp Fixtures • Remounting of Electrical Box knocked loose on Brick Fagade • Remove and Replace (1) New Wall Pack Fixture • Disconnect and Re- Connect Mechanical Electrical Supply • Ceiling Tile Replace all Ceiling Tiles Damaged from Roof Leaks • Flooring • Remove and Replace Existing Carpeting — Including Wrapping of the carpet in the Library "Pit" • Remove and Install 4" Vinyl Base, Transitions and Minor Floor Prep • Paint Repaint surfaces on the North and West Elevations • Playground Equipment • Remove and Replace (1) GameTime Overhead Tree Climber • Remove and Replace (1) GameTime Punch 2 Step Assembly