Loading...
Checkoff Sheet MS-2014-02821.tif -- 2009 INTERNATIONAL RESIDENTIAL CODE C CITY OF BLAIR REROOFING Return to lair tray Hall prior to Final Inspection 2 1 8S 16 treat, Blair, NE 88088 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing, work, please indicate compliance with the following requirement foliowiM this reroofing job. Property Address; 1441 Grant St, Blair, NE 68008 Contractor or Homeowner (if self) Quality Home Exteriors LLC Permit #: MS- Installation Date: 8/22/14 YES NO �✓ The mate'dalsand methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907,1) ❑v/ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wail line of the budding. (R905.2.7.1) ✓ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) �✓ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907. �✓ DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5) I r I FLASHING INSTALLED PROPERLY Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907,.6) emu- �u 12/8/2014 Signature of Primary Installer pate 12/8/2014 Signature of Permit Holder bate