Loading...
Checkoff Sheet MS-2014-02734.tif i 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR Y REROOF R to B lair i y Hall pr to F inal I 218 16 Street, Blair, l 6$008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. 8 1120 Caddock St, Blair, NE 6800 Property Address:. 4 Contractor or Homeowner (if self) Quality Home Exteriors LLC Permit #: MS-2014- Installation Date: 9/27/2014 YES NO 0 The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) r✓ ICE PROTECTION INSTALLED An ice barrier that consists of at least two Mayers of underlayment or of a self adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall lino of the building. (8905.2.7.1) i W STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment lows that will he encountered during installation of the roof covering system. (8907.2) W EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 0 DID NOT USE RUSTED METAL OR FLASHING. Existing vent flashing, metal edges, drain outlets collars or metal counter - flashing were not reinstalled if rusted, (R907,) F-71 C3 FLASHING INSTALLED PROPERLY. Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) 8 Tau 1218/2014 Signature of Primary Installer Cate g�, Teruo 12/8/2014 Signature of Permit Holder Date