Checkoff Sheet MS-2014-02734.tif i
2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR Y REROOF
R to B lair i y Hall pr to F inal I
218 16 Street, Blair, l 6$008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
8
1120 Caddock St, Blair, NE 6800
Property Address:. 4
Contractor or Homeowner (if self) Quality Home Exteriors LLC
Permit #: MS-2014-
Installation Date: 9/27/2014
YES NO
0 The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
r✓ ICE PROTECTION INSTALLED An ice barrier that consists of at least two Mayers of
underlayment or of a self adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall lino of the building. (8905.2.7.1)
i
W STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment lows
that will he encountered during installation of the roof covering system. (8907.2)
W EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
0 DID NOT USE RUSTED METAL OR FLASHING. Existing vent flashing, metal edges,
drain outlets collars or metal counter - flashing were not reinstalled if rusted, (R907,)
F-71 C3 FLASHING INSTALLED PROPERLY. Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
8 Tau 1218/2014
Signature of Primary Installer Cate
g�, Teruo 12/8/2014
Signature of Permit Holder Date