Loading...
Checkoff Sheet MS-2014-02032.tif i 2009 INTERNATIONAL RESIDENTIAL CODE I REROOFING Return to Blair City [all prior to Final Inspection 'l Street, Blair, NE 8 008 Because of limitations caused by the unfeasibility to perform detailed inspections which would � not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Prope Address. 1095 N 25th Avenue, Blair, NE 68008 Contractor or Homeowner (if self) : Quality Home Exteriors LLC Permit #. MS Installation Date. 8/29/2014 YES NO ❑✓ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building cane. (R907.1) F✓ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of i nderlayment or of a self - adhering polymer modified bitumen 'sheet was installed and extends at least from the eaye's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) F✓ STRUCTURAL COMPONENTS ARE SOUND. The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered; during installation of the roof covering system. (8907.2) ExISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 i �✓ DID NOT USE RUSTED METAL OR FLASHING Existing vent flashing, metal edges, drain cutlets, collars or metal counter-flashing were not reinstalled if rusted. (8907.5) LJ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.8) i 12/8/2014 Signature of primary Installer Date 12/8/2014 Signature of Permit Holder Date � I II