Loading...
Checkoff Sheet MS-2014-01102.tif i 2"U"'09 INTERNATIONAL RESIDENTIAL CODE i_ CITY OF BLAIR REROOFING Return to Blair City i y Tall prior to Final Inspection 8 16 Street, ` lair, NE 68008 Because of limitations caused by the Infeasibility to perform detailed inspections which would not interfere with reroofing work Tease indicate compliance with the following requirements following this reroofing job. Property Address: 2217 Grant St, Blair, NE 68008 Quality Home Exteriors LLC Contractor or Homeowner (if self) Permit : IVISR2014- 01102 Installation Date: 9/26/2014 YES NO j �✓ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) i ICE PROTECTION INSTALLED An ice barrier that consists of at lust two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (8905.2.7.1) i STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads j that will be encountered during installation of the roof covering system. (8907.2) Fv EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 �✓ DID NOT USE RUSTED METAL FOR FLASHING Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) FLASHING INSTALLED PROPERLY Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be pruned prior to installation. (R907..6) 12/8/2014 Signature of Primary Listaller Date 3 yu 12/8/2014 i Signature of hermit Holder Date