Checkoff Sheet MS-2014-01102.tif i
2"U"'09 INTERNATIONAL RESIDENTIAL CODE
i_
CITY OF BLAIR REROOFING
Return to Blair City i y Tall prior to Final Inspection
8 16 Street, ` lair, NE 68008
Because of limitations caused by the Infeasibility to perform detailed inspections which would
not interfere with reroofing work Tease indicate compliance with the following requirements
following this reroofing job.
Property Address: 2217 Grant St, Blair, NE 68008
Quality Home Exteriors LLC
Contractor or Homeowner (if self)
Permit : IVISR2014- 01102
Installation Date:
9/26/2014
YES NO j
�✓ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
i
ICE PROTECTION INSTALLED An ice barrier that consists of at lust two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (8905.2.7.1)
i
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads j
that will be encountered during installation of the roof covering system. (8907.2)
Fv EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
�✓ DID NOT USE RUSTED METAL FOR FLASHING Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5)
FLASHING INSTALLED PROPERLY Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be pruned prior to installation. (R907..6)
12/8/2014
Signature of Primary Listaller Date
3 yu 12/8/2014
i
Signature of hermit Holder Date