Loading...
Checkoff Sheet MS-2014-01100.tif I NTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING Return to B lair ity Hall prior to Final Inspectio 218 S 8 treet, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing worts, please indicate compliance with the fallowing requirements following this reroofing job, Property Address. 209 Riverview Drive, Blair, NE 68008 l Contractor or Homeowner (if self), Quality Home Exteriors LLC Permit # MS - 20 1 - 01100 Installat Date: YES NO 0✓ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907, I) 0✓ i� ICE PROTECTION INSTALLED A ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R906.2.7.1) �✓ STRUCT COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the materiel and equipment loads that will be encountered during installation of the roof covering system.. (R907.2) EXISTING COVERING WAS REMOVED Existing roof covering was removed for one of the reasons required by section R907.3 �✓ DID NOT USE RUSTED. METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-fl were not reinstalled if rusted. (8907.5) ✓� FLASHING INSTALLED PRtPERLY. Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907,6) 12/8/2014 Signature of Primary Installer Date Uu Z;)4cu")-td 12/8/2014 Signature of Permit Holder Date i