Checkoff Sheet MS-2014-01101.tif 2 114TERNATIONAL RESIDENTIAL CODE
i
CITY OF BLAIR
Return to B lair C ity Hall prior to Final Inspection
218S 1 6th Street, Blair, NE 68008
Because of limitations caused by the Infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the fallowing requirements
following this reroofing job.
Property Address: 120 E Riverview Dive, Blair, NE 68008
Contractor or Homeowner (if self)
Quality Home Exteriors LLC
Permit #: MS-
Installation Date: 11/15/2014
YES Na
0✓ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the bu ilding code. (11907.1)
0✓ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
+underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eaves edge to a point at least 24 inches inside the exterior
wall line of the building. (8905.2.7.1)
i
❑✓ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment bads
that will be encountered during installation of the roof covering system. (R907f2)
0✓ EXISTING COVERING WAS REMt3VED: Existing roof covering was removed for one
of the reasons required by section 8907.3
DID NOT USE RUSTED METAL QR SLASHING; Existing vent flashing, metal edges,
drain cutlets, collars or metal counter- flashing were not reinstalled if rusted, (R907,5)
FLASHING INSTALLED PROPERLY Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be pruned prior to installation. (R907.6)
Sum T�uu�,� 12/8/2014
Signature of Primary Installer Fate
12/8/2014
Signature of Permit Holder Date
i