Checkoff Sheet MS-2014-01093.tif 12/09/2014 15:48 FAX 4024277414 BENNETTS 4 001
2009 INTERNATI AL G CHECKOFF SHEET
CITY OF BLAIR REROOFIN.
.
etlurn to lair City Hall prior to Final inspection
21 i 6th Street, Blair, NE 66006
ecause of limitations caused by the infeasibility tp perform detailed inspections which would i
of interfere with reroofing work, please indicate compliance with the following requirements
allowing this reroofing Job.
)roperty Address:
`,contractor or Homeowner (if self)
permit #: M - 2014® .7
i
natallation Date: i
(ES
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (Rg07.1)
ICE PROtECTION [ STALLED: An ice barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet installed and
extends at least from the eave's edge to a point at least 24 inches inslde the exterior
wall line of the building, (8905.2.7.1)
S TRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
i
i
EXISTING COVERING WAS 1EMt]VED: Existing roof covering was removed for one
of the reasons required by section 8907,3
DID NOT USE RUSTED METAL OR FL Existing vent flashing, metal edges,
drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (8907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed In accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous Materials are to be adhered shall be primed prier to installation. (R907.0),
etc
Sig at r of Pr Mary Installer Date
Date
Signature of Permit Holder
C