Loading...
Checkoff Sheet MS-2014-01093.tif 12/09/2014 15:48 FAX 4024277414 BENNETTS 4 001 2009 INTERNATI AL G CHECKOFF SHEET CITY OF BLAIR REROOFIN. . etlurn to lair City Hall prior to Final inspection 21 i 6th Street, Blair, NE 66006 ecause of limitations caused by the infeasibility tp perform detailed inspections which would i of interfere with reroofing work, please indicate compliance with the following requirements allowing this reroofing Job. )roperty Address: `,contractor or Homeowner (if self) permit #: M - 2014® .7 i natallation Date: i (ES The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (Rg07.1) ICE PROtECTION [ STALLED: An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet installed and extends at least from the eave's edge to a point at least 24 inches inslde the exterior wall line of the building, (8905.2.7.1) S TRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) i i EXISTING COVERING WAS 1EMt]VED: Existing roof covering was removed for one of the reasons required by section 8907,3 DID NOT USE RUSTED METAL OR FL Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (8907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed In accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous Materials are to be adhered shall be primed prier to installation. (R907.0), etc Sig at r of Pr Mary Installer Date Date Signature of Permit Holder C