Loading...
Checkoff Sheet MS-2014-00825.tif t 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING Return to Blair City Hall prior to Find Inspection 218S 6 .Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would j not interfere with rero worts, please indicate compliance with the following requirements following this reroofing yob. Property Address: 2035 Northridge Circle, Blair, NE 68008 Contractor or Homeowner (if self )l Qua I ity Home Exteriors LLC � Permit #.- MS -2014 - 00825 Installation Date: YES NO 0✓ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED An ice barrier that consists of at leant two Mayers of underiayment or of a self - adhering polymer modified bitumen sheet was installed and extends a least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) 0✓ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment lows that will be encountered during installation of the roof covering system. (8907.2) �✓ EXISTING COVERING 1NAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 ❑� DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) FLASHING INSTALLED PROPERLY Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to b adhered s hall be p prior to i nstallation. (R907.6) I Signature of Primary installer Date Signature of permit Holder date