Checkoff Sheet MS-2014-00825.tif t
2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING
Return to Blair City Hall prior to Find Inspection
218S 6 .Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would j
not interfere with rero worts, please indicate compliance with the following requirements
following this reroofing yob.
Property Address:
2035 Northridge Circle, Blair, NE 68008
Contractor or Homeowner (if self )l Qua I ity Home Exteriors LLC �
Permit #.- MS -2014 - 00825
Installation Date:
YES NO
0✓ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION INSTALLED An ice barrier that consists of at leant two Mayers of
underiayment or of a self - adhering polymer modified bitumen sheet was installed and
extends a least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
0✓ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment lows
that will be encountered during installation of the roof covering system. (8907.2)
�✓ EXISTING COVERING 1NAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
❑� DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5)
FLASHING INSTALLED PROPERLY Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to b adhered s hall be p prior to i nstallation. (R907.6)
I
Signature of Primary installer Date
Signature of permit Holder date