Loading...
Checkoff Sheet MS-2014-00824.tif INTERNAT RESIDENTI CITY OF BLAIR FN _F SHEET R eturn to lair Clay H all prior to Final Inspection ' 1 Street, Blair, N 68088 Because of limitations caused by the infeasibility to perform detailed inspections which wound not interfere with reroofing work, please indicate compliance with the fallowing requirements foilowina this reroofing job. Property Address: 1548 Colfax St, Blair, NE 68008 Contractor or Homeowner (if self) : Quality Home Exteriors LLC Permit #: MS- 2014- 00824 Installation Date: YES NO �✓ ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) l� ICE PROTECTION INSTALLED An ice barrier that consists of at least two l ayers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the. eavWs edge to a point at least 24 inches inside the exterior wall line of the building. (8906.2.7.1) 7 STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment leads that will be encountered during installation of the roof covering system. (R907.2) 0✓ EXISTING COVERING 'JA AS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 ❑ DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R9075) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed i accordance with approved manufacturer's installation instructions. Fetal flashing to which bituminous materials are to be adhered shall be primed prier to installation. (8907..6) Signature of Primary Installer bate Signature of permit Holder bate I i