Checkoff Sheet MS-2014-00823.tif I
RES 200`9 INTERNATIONAL
I TY OF'BLAIR REROOFING CHECKOFF
Return to B lair City Hall prior to Final Inspection
218 S 1 Street, Blair, NE 68088
Because of limitations caused by the infeasibility to perform detailed inspections which would
not Interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Property Address:
535 S. 25th St, Blair, NE 68008
Contractor or Homeowner (if self} : Quality Home Exteriors LLC
hermitm MS-2014-
Installation Date. . 7/16/2014
YES NO
❑✓ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.'I)
Q ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering systems (8907,2)
0 ❑ ExiSTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907w3
�✓ I� D NOT USE RUSTED METAL OR F LASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (8907.5)
Q FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prier to installation. (8107.6)
12/8/2014
Signature of Primary Installer Date
12/8/2014
Signature of Permit Holder Date