Checkoff Sheet MS-2014-00781.tif 12/00/2014 11:06 FAX 4025332173 U001/001
RESIDEN 2009 INTMNATIONAL
CITY OF L r . REROOFING T
Return to lair Cit Hall prior t* F inal I nspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility' to perform detailed Inspections which would
not Interfere with rer oofing work, please indicate co ropliance with the following requirements
following this reroofing job.
Property Address:
Contractor or Homeowner (if self)
Permit M. MS-2014- OrT
Installation Bate: n 0
YES NO
The materials and methods of application used for recovering or replaoing the existing
roof covering comply with the requirements of the building code. (8907.1)
ICE PROTECTION INSTALLED An ice barrier that cdnsists of at -least two layers of
underlayment or of a self adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to.a point at least 24 inches inside the exterior
wall line of the building. (8900.2,7.1)
i
STRUCTURAL COMPONENTS ARE SOUND', The structural roof components are f
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one �
of the reasons required by section 8907.3
LAID NOT USE RUSTED METAL, OR FLASHING. Existing Vent flashing, rrtietal edges,
drain outlets, collArs or metal counter flashing were not reinstalled If rusted. (R907.6)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation Instructions, Metal flashing to which
bituminous Materials are to be adhered shall be primed prior to installation. (R907.8)
w
4/
Signature of Primary Installer Dat
Signature of Permit Holder Date