Loading...
Checkoff Sheet MS-2014-00781.tif 12/00/2014 11:06 FAX 4025332173 U001/001 RESIDEN 2009 INTMNATIONAL CITY OF L r . REROOFING T Return to lair Cit Hall prior t* F inal I nspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility' to perform detailed Inspections which would not Interfere with rer oofing work, please indicate co ropliance with the following requirements following this reroofing job. Property Address: Contractor or Homeowner (if self) Permit M. MS-2014- OrT Installation Bate: n 0 YES NO The materials and methods of application used for recovering or replaoing the existing roof covering comply with the requirements of the building code. (8907.1) ICE PROTECTION INSTALLED An ice barrier that cdnsists of at -least two layers of underlayment or of a self adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to.a point at least 24 inches inside the exterior wall line of the building. (8900.2,7.1) i STRUCTURAL COMPONENTS ARE SOUND', The structural roof components are f capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one � of the reasons required by section 8907.3 LAID NOT USE RUSTED METAL, OR FLASHING. Existing Vent flashing, rrtietal edges, drain outlets, collArs or metal counter flashing were not reinstalled If rusted. (R907.6) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation Instructions, Metal flashing to which bituminous Materials are to be adhered shall be primed prior to installation. (R907.8) w 4/ Signature of Primary Installer Dat Signature of Permit Holder Date