Loading...
Checkoff Sheet MS-2014-03225.tif 2009 INTERNATIONAL RESIDENTIAL CODE HECKOFF SHEET CITY OF BLAIR REROOFING C all* prior to Final inspection Return to Blair MY H M S ie street, Blair, NE 68008 t *p detailed I which would Because o f li caused by the work, please indicate compliance with the following requirements not interfere with reroofing foII2A:1nq this reroofing job. Permit installation Date. YES NO application us ed f recovering or replacing the existing The materials and methods Of the building code. (R907.1) ro of covering cornply W th re quirements of EGTi DN INSTALLED: An ice barrier that consists of at least two layers Of ICE PROT m ner odified bitumen sheet was installed and underlayment or of a selt-actner" Yuly extends at leas ' e exterior r t f the eave's edge to a point at le as t 24 inches insid wall line of �(RpO&2.7.1) STRUCTURAL coMPONENTS ARE soUND, . The structural ro of components are -nent loads and the material and equip, capable of supporting the roo f covering system that will be enco untered during installation of the roof covering system- (R907-2) EXISTING cOVERING WAS REMOVED= Existing roof covering was removed for one of the reasons required by se ction 8907.3 NO RUSTED METAL OR FLASHING: Existing t flas, metal ed . dges, rai outlets, collars or metal Ling we ot installed if ru (R907.5) FLAS HING INSTALLED PROPERLY': Flashing shall be rec onstructed in accordance Is installation instructions. Metal flashing to which w ith approved manufacturer bituminous materials are to be adhered shall be p rimed prior to installation. (8907.6) Date Signature of Primar Installer Date Signature of Permit Holder