Checkoff Sheet MS-2014-03225.tif 2009 INTERNATIONAL RESIDENTIAL CODE
HECKOFF SHEET
CITY OF BLAIR REROOFING C
all* prior to Final inspection
Return to Blair MY H
M S ie street, Blair, NE 68008
t *p detailed I which would
Because o f li caused by the
work, please indicate compliance with the following requirements
not interfere with reroofing
foII2A:1nq this reroofing job.
Permit
installation Date.
YES NO application us ed f recovering or replacing the existing
The materials and methods Of the building code. (R907.1)
ro of covering cornply W th re quirements of
EGTi DN INSTALLED: An ice barrier that consists of at least two layers Of
ICE PROT
m
ner odified bitumen sheet was installed and
underlayment or of a selt-actner" Yuly
extends at leas ' e exterior r
t f the eave's edge to a point at le as t 24 inches insid
wall line of �(RpO&2.7.1)
STRUCTURAL coMPONENTS ARE soUND, . The structural ro of components are
-nent loads
and the material and equip,
capable of supporting the roo f covering system
that will be enco untered during installation of the roof covering system- (R907-2)
EXISTING cOVERING WAS REMOVED= Existing roof covering was removed for one
of the reasons required by se ction 8907.3
NO RUSTED METAL OR FLASHING: Existing t flas, metal ed . dges, rai outlets, collars or metal Ling we ot installed if ru (R907.5)
FLAS HING INSTALLED PROPERLY': Flashing shall be rec onstructed in accordance
Is installation instructions. Metal flashing to which
w ith approved manufacturer
bituminous materials are to be adhered shall be p rimed prior to installation. (8907.6)
Date
Signature of Primar Installer
Date
Signature of Permit Holder