Loading...
Checkoff Sheet MS-2014-02044.tif 2009 INTERNATIONAL RESIDENTIAL CODE R REROOFING CHECKOFF SHEET CITY OF BLAI o Final Inspection Return to wair City all prior t 218s i6 street, Bialr NE 68008 Because o f li caused by the infeasibility to perform detailed i followin irements nspections which would not interfere with reroofing work, please indicate compliance with the g requ fqqgnqffl this reroofing job. Permit installation Date' YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installs and extends �dg to a point at least 24 inches linsidg. the exterior wall line of the building. (R9052. 7-1) The structural roof components are capable of supporting the roof ct�vering systerrr� and the material and equipment loads that will e encountered during installation of e roof covering system 0907.2) EXISTI�!p COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 No USTED METAL )_R FLASHING.- Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted, (8907.5) Flashing shall be reconstructed in accordance oit FLA G _IA�L E D�R PERLY*' Metal flashing to which H N NST L P 0 installation instructions. ion. (R907.6) rove uf_ -s h a ppro ved m tor to installati b itumino u s pp ma ri is are to adhered shall be primed prior te a be ate �ig�nature, of Primary installer TN 1� Date Signature of Permit Holder