Checkoff Sheet MS-2014-02044.tif 2009 INTERNATIONAL RESIDENTIAL CODE
R REROOFING CHECKOFF SHEET
CITY OF BLAI
o Final Inspection
Return to wair City all prior t
218s i6 street, Bialr NE 68008
Because o f li caused by the infeasibility to perform detailed i followin irements
nspections which would
not interfere with reroofing work, please indicate compliance with the g requ
fqqgnqffl this reroofing job.
Permit
installation Date'
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installs and
extends �dg to a point at least 24 inches linsidg. the exterior
wall line of the building. (R9052. 7-1)
The structural roof components are
capable of supporting the roof ct�vering systerrr� and the material and equipment loads
that will e encountered during installation of e roof covering system 0907.2)
EXISTI�!p COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
No USTED METAL )_R FLASHING.- Existing vent flashing, metal edges, drain
outlets, collars or metal counter-flashing were not reinstalled if rusted, (8907.5)
Flashing shall be reconstructed in accordance
oit FLA G _IA�L E D�R PERLY*'
Metal flashing to which
H N NST L P 0 installation instructions. ion. (R907.6)
rove uf_ -s
h a ppro ved m tor to installati
b itumino u s pp ma ri is are to adhered shall be primed prior te a be
ate
�ig�nature, of Primary installer
TN
1� Date
Signature of Permit Holder