Loading...
Checkoff Sheet MS-2014-02820.tif i i I NTERNATIONAL ` CITY OF BLAIR REROOFING CHECKOFF SHEET I R to B lair City Hall prior to Final Inspection 21 1 Street, B lair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements fallowing this reroofing job. i Property Address: 3030 Westridge Drive Contractor or Homeowner (if self) Quality Home Exteriors LLC Permit #: MS-2014- Installation Date; 11 /5/14 YES NO Q ✓ The materials and methods of application used for recovering or replacing the existing j roof covering comply with the requirements of the building cede. (8907.1) ICE PROTECTION INSTALLED An ice barrier that consists of at bast two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and � extends at least from the eave's edge to a point at least 24 inches inside the exterior j wall line of the building. (R906.2.7.1) ❑✓ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) i ✓� 13 EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 890753 �✓ 0 DID NOT USE RUSTED METAL OR FLASHING,. Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) ❑✓ 0 FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) 12/4/14 Signature of Primary Installer Date 34Z;2.'z1 Z�)4�Izd 12/4/14 Signature of Permit Holder Date