Loading...
Checkoff Sheet MS-2014-00993.tif I I 12x'03/2014 16:00 7790112 GOEDEN CONSTRUCTION PAGE 01 I NTERNATIONAL i CITY OF BLAIR REROO CHECKOFF SHEET Retu m to Blair city Hall' prior to Final inspection 218 B i r Street, Blair, NE 6800$ i j3sca►uso of limitations caused by than Infeasibility to `perform detailed inspections which would not lnterfars with roreofir g work, please Indicate compliance with the following requirements oIll } this reroofing Job. Permit 0: installation gate: 0 YES NO Thai materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building coda. (ROM) CS =�TioN lN$TALLE An ice barrier that r,Qrislste of at least two layers of underlayment or of a self adhering polymer modified bitumen sheetw s lnst ed and extends 4_is rom the eave'$ edge to a point at least 24 inches Inside the exterior wall line of the building. (R9O5.2.7.1) STRLJC U L RteG(]llfi C�NI"NTS AR SOUND: The structural roof components are T P capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (11807.2) ;STING 60VI -RI G W S 1 9M0 V-r3 Existing roo$ covering was removod for one of tho reasons required by section R907.3 NO UST D WIg A OR FLASHING t Hxlsting vent tTashing, metal edges, drain outlets, collars or metal counter flashing were not reinstalled If rusted. (RG07.5) Q, FLM jjjG IN IALLm EROpjRW dashing shall be reconstructed In accordsnce with approved manufacturer's Installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to Installation. (R907.6) Si Lure R Primary Installer Date z Signatu P Permit Holder Data I i i I