Loading...
Checkoff Sheet MS-2014-02827.tif DEC /03/2014/WED 07;37 AM FAX No, FA02 /005 INTERNATIONAL RESI DENTIAL CITY OF BLA REROOF CHECKOFF SHEET Return to lair City Hall prior to Final Inspection 218S16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed Inspections which would not interfere with reroofing work, please indicate compliance with the fallowing requirements following this reroofing job. Property Address• Contractor or Homeowner (if self) Permit #; MS-2014- QSa Installation Date; YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building cede. (8907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) I EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one � of the reasons required by section R907.3 DID NOT USE RUSTED METAL OR FLASHING, Existing. vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8807.5) FLASHING INSTALLED PROPERLY; f=lashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which �- bituminous n10 Is are to be adhered shall be primed prior to installation. (11807.6) Si na ure of Primary nstaller Date atu Permit F o der Date i