Checkoff Sheet MS-2014-02646.tif i
I
I
I
j
2009 INTERNATIONAL RESIDENTIAL C ODE
CITY. LAIR REROOFING CHECKOFF SHEET �
Return to Blair City Hall prior to Final inspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
i
not interfere with reroofing work, please indicate compliance with the following requirements
To this reroofing job, j
Permit M
I
i
Installation Date:
YE NO
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
® ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
1 I
L�J ® STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
j
of the reasons required by section R907.3
❑ NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5)
I
I
® FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
za�,
Slgn0jw6 of PrkKary installer Date
Signat of Permit Holder Date
i
I