Checkoff Sheet MS-2014-01633.tif i
DEC /03 /20WWED 07:38 AM FAX No, P, 004/005
200.9 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLA REROOF
i
Return to Blair C y Hall prior to Final Inspection
21 B "16 Street, Blair, NE 68008
i
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
followi'ne this reroofing job.
r
Property Address:
Contractor or Homeowner (if self) : ?
Permit #: M -2014 -
Installation Data: `t
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907- I)
ICE PROTECTION INSTALLED An lee barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUNb: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
DID NOT USE RUSTEn METAL OR FLASHING: Existing-vent flashing, metal edges,
drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5) j
FLASHING INSTALLED PROPERLY F lashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8907.5)
I
ignature of Primary Instal er Date
fin
u of Permit Holder Date �
I