Loading...
Checkoff Sheet MS-2014-01037.tif DEC /03/2014/WED 07;38 AM FAX No, P,005/005 i ! INTERNATIONAL CITY OF BLAIR REROOFING CHECKOFF Return to Blair City Hall prior to Final Inspection 218S16 t " Street, 131air, NE 68008 j i Bocause of limitations caused by the Infeasibility to perform detailed inspections which would not interfere with reroofing world please indicate compliance with the following requirements fallowing this reroofing job. Property Address' Contractor or Homeowner (if self) ! Permit #: IVI - 2014 - Installation bate YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.I) Ilk ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (8905,21.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be during installation of the roof covering system. (8907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 I DID NOT Usg RUSTED METAL OR FLASHING:. Existing.vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) [gn ure of Primafy Installer Gate r 1atu)Sro s older pate f