Loading...
Checkoff Sheet MS-2014-00626.tif Dec, 2. 2014 11:24AM No, 1487 P. 2 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLA REROOFING CHECKOFF SHEET Return to B lair City Hall prior to Final Inspection 218 S 16 street, Blair, NB 68008 Because of limitations caused by the to perform detailed Inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Property Address: _ 2— C) O C Contractor or Homeowner (if self) ; rr w�_1_C� -, ,Do ►''1 Permit #: IVIS- 2014- C) c) 1 z Q to Installation Date: 1 c o YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underiayment or of a self- adhering polymer modified bitumen sheet was installed and extends a t least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.71) ® STRI]CTURAI_ COMPONENTS ARE SOUND: The structural roof components are 'capable of supporting the roof covering system and the material and equipment leads that will be encountered during installation of the roof covering system. (R907.2) �® EXISTING COVERING WAS REMOVED. Existing roof covering was removed for one of the reasons required by section 8907.3 DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, tra outlets, collars or metal counter-flashing were not reinstalled if rusted. (8907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bitu inous materials are to be adhered shall be primed prior to installation. (8907.6) � 4 Signature of W1 stall Date Signatu a of Permit H Ider Date