Checkoff Sheet MS-2014-00626.tif Dec, 2. 2014 11:24AM No, 1487 P. 2
2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLA REROOFING CHECKOFF SHEET
Return to B lair City Hall prior to Final Inspection
218 S 16 street, Blair, NB 68008
Because of limitations caused by the to perform detailed Inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Property Address: _ 2— C) O C
Contractor or Homeowner (if self) ; rr w�_1_C� -, ,Do ►''1
Permit #: IVIS- 2014- C) c) 1 z Q to
Installation Date: 1 c o
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underiayment or of a self- adhering polymer modified bitumen sheet was installed and
extends a t least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.71)
® STRI]CTURAI_ COMPONENTS ARE SOUND: The structural roof components are
'capable of supporting the roof covering system and the material and equipment leads
that will be encountered during installation of the roof covering system. (R907.2)
�® EXISTING COVERING WAS REMOVED. Existing roof covering was removed for one
of the reasons required by section 8907.3
DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
tra outlets, collars or metal counter-flashing were not reinstalled if rusted. (8907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bitu inous materials are to be adhered shall be primed prior to installation. (8907.6)
� 4
Signature of W1 stall Date
Signatu a of Permit H Ider Date