Loading...
Checkoff Sheet MS-2014-00389.tif I Nov.26.2014 2:18PM No.1453 P. 4 200-9 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR Return to B lair City Hall prior to Final Inspection 218 S 16 Street, Blair, NE 60008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Z_70 S - . Property Address: ` ICk Contractor or Homeowner (if self) : Y a 1 Permit #: _MS-2014- Installation Date: 4 �I Y S NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers'of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a paint at least 24 inches inside the exterior wall line of the building, (R905.2.7.1) 4P 0 STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the re2sons required by section R907.3 DID NOT USE RUSTED METAL OR FLASHING. Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) L P FLASHING INSTALLED PROPERLY: flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) Signature of PH a staller bate Od &6ACWZL� 61 Signatur of Permit Hier Date i