Loading...
2014-37RESOLUTION NUMBER 2014 - 37 PRELIMINARY ENGINEERING SERVICES AGREEMENT SUPPLEMENTAL AGREEMENT NUMBER 1 — B01216 COUNCIL MEMBER KEPHART INTRODUCED THE FOLLOWING RESOLUTION: WHEREAS, City of Blair and JEO Consulting Group, Inc., have previously executed a Preliminary Engineering Services Agreement (1301216) for a transportation project for which the Local Public Agency (LPA) would like to obtain Federal Funds; WHEREAS, City of Blair understands that it must continue to strictly follow all Federal, State and local laws, rules, regulations, policies and guidelines applicable to the funding of this Federal -aid project; and WHEREAS, City of Blair and JEO Consulting Group, Inc. which to enter into a preliminary engineering services supplemental agreement setting out modifications and /or additional duties and /or funding responsibilities for the Federal -aid project. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF BLAIR, NEBRASKA, that James Realph, Mayor, is hereby authorized to sign the attached Supplemental Agreement Number 1 between City of Blair and the JEO Consulting Group, Inc. NDOR Project Number: ENH- 89(30) NDOR Control Number: 22549 NDOR Project Description: Blair Connector Trails COUNCILMEMBER KEPHART MOVED THAT THE RESOLUTION BE ADOPTED AS READ, WHICH SAID MOTION WAS SECONDED BY COUNCILMEMBER ANDERSEN. UPON ROLL CALL, COUNCILMEMBERS SHEPARD, STEWART, KEPHART, ANDERSEN AND JENSEN VOTING "AYE ", AND COUNCILMEMBERS NONE VOTING "NAY ", MAYOR REALPH VOTED AYE TO BREAK THE TIE. MAYOR DECLARED THE FOREGOING RESOLUTION PASSED AND ADOPTED THIS 14' DAY OF OCTOBER, 2014. CITY OF BLAIR, NEBRASKA B v J S REALPH, MAYOR ATTEST: Ate't-'A K (�- BRENDA R WIIEELER, CITY CL (SEAL) STATE OF NEBRASKA ) )ss WASHINGTON COUNTY ) BRENDA R. WHEELER, hereby certifies that she is the duly appointed, qualified, and acting City Clerk of the City of Blair, Nebraska, and that the above and foregoing Resolution was duly passed and adopted at a regular meeting of the Mayor and City Council of said City held on the 14th day of October, 2014. �6� '( (114, - BRENDA WHEELER, CITY CLERK SUPPLEMENTAL AGREEMENT #1 CITY OF BLAIR JEO CONSULTANT GROUP, INC. PROJECT NO. ENH- 89(30) CONTROL NO. 22549 BLAIR CONNECTOR TRAILS THIS SUPPLEMENTAL AGREEMENT is between the City of Blair ( "LPA") and JEO Consulting Group ( "Consultant "), collectively referred to as the "Parties ". WHEREAS, Consultant and LPA entered into an agreement ( "Original Agreement ") B01216 providing for Consultant to provide for preliminary engineering design on LPA's Federal Aid project, and WHEREAS, a separate Federal Emergency Management Agency project to construct flood protection around the Water and Wastewater Treatment Facility will impact the Lincoln Trail extension portion of this project, resulting in the adjustment of grades and location of the Trail along Fairview Road and the parking lot; therefore, this additional work will be added under this Supplemental Agreement, and WHEREAS, it is necessary to increase Consultant's compensation by this Supplemental Agreement for the additional work necessary to complete the project, and WHEREAS, it is the desire of the LPA that the project be constructed under the designation of Project No. ENH- 89(30); as evidenced by the Resolution of LPA, attached as EXHIBIT "A" and incorporated herein by this reference, and NOW THEREFORE, in consideration of these facts and mutual promises, the Parties agree as follows: SECTION 1. SCOPE OF SERVICES Consultant will perform the additional work as set out in in Exhibit "B" Consultant Work Order 1, attached and incorporated herein by this reference. SECTION 2. NOTICE TO PROCEED AND COMPLETION SCHEDULE The State issued Consultant a written Notice -to- Proceed on September 22, 2014. Any work or services performed by Consultant on the project prior to the date specified in the written Notice -to- Proceed is not eligible for reimbursement. Consultant will complete all work as set out in the Original Agreement, and this Supplemental Agreement by July 1, 2017. SECTION 3. FEES AND PAYMENTS For the work required, SECTION 9 FEES AND PAYMENTS of the Original Agreement is hereby amended in accordance with Exhibit "B" so that the fixed - fee - for - profit is increased from $5,184.57 to $5,580.95, an increase of $396.38. Actual costs are increased from $43,627.66 to $46,717.26, an increase of $3,089.60. The total agreement amount is increased from Project No. ENH- 89(30) Control No. 22549 Blair Connector Trails Page 1 of 3 AGREEMENT # BO 1216 Sup #1 $48,812.23 to $52,298.21, an increase of $3,485.98 which Consultant must not exceed without the prior written approval of LPA. SECTION 4. ENTIRE AGREEMENT The Original Agreement, any and all other previous supplements thereto, and this Supplemental Agreement, constitute the entire agreement ( "The Agreement ") between the Parties. The Agreement supersedes any and all other previous communications, representations, or other understandings, either oral or written; all terms and conditions of the Original Agreement and all previous supplements thereto, to the extent not superseded, remain in full force and effect, and are incorporated herein as if set forth in their entirety. SECTION 5. CONSULTANT CERTIFICATION AND REAFFIRMATION The undersigned duly authorized representative of Consultant, by signing this Supplemental Agreement, hereby reaffirms, under penalty of law, the truth of the certifications set out in the Original Agreement and all Supplements thereto, including this Supplement. Further, Consultant has a duty to inform LPA of any material changes in the accuracy of all assertions set out in the Original Agreement and all Supplements thereto. SECTION 6. CERTIFICATION OF LPA By signing this Supplemental Agreement, I do hereby certify that, to the best of my knowledge, Consultant or its representative has not been required, directly or indirectly as an express or implied condition in connection with obtaining or carrying out this agreement to: (a) employ or retain, or agree to employ or retain, any firm or person, or (b) pay or agree to pay to any firm, person, or organization, any fee, contribution, donation, or consideration of any kind. I acknowledge that this certification is to be furnished to the FHWA, upon their request, in- connection with this agreement involving participation of Federal -Aid highway funds and is subject to applicable LPA and federal laws, both criminal and civil. Project No. ENH- 89(30) Control No. 22549 Blair Connector Trails Page 2 of 3 AGREEMENT # BO1216 Sup #1 IN WITNESS WHEREOF, the Parties hereby execute this Supplemental Agreement pursuant to lawful authority as of the date signed by each party. Further, the Parties, by signing this Supplemental Agreement, attest and affirm the truth of each and every certification and representation set out herein. EXECUTED by Consultant this Z day of JEO C LTING GROUP, INC. R ert igham resident STATE OF NEBRASKA ) )ss. SAUNDERS COUNTY ) SUBSCRIBED AND SWORN to before me this day of ` cam 2014. GENERAL NOTARY - State of Nebraska MICHELLE VOBORIL , - ° My Comm. Exp. Nov, 14, 2014 Notary Public EXECUTED by LPA this L day of a Gt0 , 2014. CITY OF BLAIR James Realph Ma Subscribed and sworn to before me this �q day of Odd 6e ( - , 2014. W kj--a� Clerk STATE OF NEBRASKA DEPARTMENT OF ROADS Form of Agreement Approved for Federal Funding Eligibility: Date AGRS -1 S(8 -4 -14) Project No. ENH- 89(30) Control No. 22549 Blair Connector Trails Page 3 of 3 AGREEMENT # B01216 Sup #1 Consultant Work Order (Local Projects) Project No.: _ Control No.: ENH -89 30 2254 Consultant: (Name and Representative) Agreement No.: Work Order No.: JEO Consulting Group Inc., Julie O gden PM 801216 1 LPA: (Name and Representative) Constr. Change Order No.: (If applicable) City of Blair, Allen Schoemaker NA All parties agree the following described work needs to be performed by the consultant as part of the referenced project. All parties concur and hereby give notice to proceed based on the following: justification to modify contract, scope of services, deliverables, schedule, and estimated total fee. All other terms of existing agreements between the parties are still in effect. It is understood by all parties that the work described herein will become part of a future supplement to the agreement indicated above. Justliication io modify agreement: (include scope of services, deliverables, and schedule) The city received funding from FEMA to construct flood protection around the Water and Wastewater Treatment Facility. This will impact the Lincoln Trail extension portion of this project resulting in the adjustment of grades and location of the Trail along Fairview Road and the parking lot. Please see attached scope of services. Work Title Summary of l=ee Co o n n A. Total Direct Labor Cost = 985.17 B. Overhead (Factor' x A) - 2,099.50 Preliminary Engineering _ C. A + B - 3,084.67 D. Profft/Fee (Factor - x C) = 396.38 "Overhe Factor: 213.11% E Direct Non -Labor Cost = 4.93 "ProfiUFee Factor: 1 12.85% F. Subconsultant Services = 0.00 Total Fee Notes: Facilities Capital is 0.00% of Direct Labor and inicuded as TOTAL FEE: C + D + E + F = $3,485.98 a direct expense. ❑ ESTIMATED TOTAL FEE: ❑ FINAL TOTAL FEE: Work Order Authorization - May be granted by email and attached to this document. Consultant: f � - — •�....- _ -• - -- - -- � - • "�•�� �� ZZ -- �'.. Notice to Proceed be b Name �Siq turn _ Date will ranted 9 Y email by: LPA; LPS PC for �.^..r/r 4t?,Mc?- -._- _.._.___.. Preliminary ....-- - -• -•- -- Name Signature Date Engineering & PC for PC LPS PC (for Preliminary Engineering) and Stat ep. (for Construction Engineering): Co o n n q . W Engineering. Name - _ Date /I Signature LPS Unit Head Review (for PE Phase): _ ,. Name f r Signature / uaie LPS Engineer or Construction Engi er (construction Phase}; Name �_gnaure - --- � Q FHWA: (FHWA Approval on Full Oversight Projects Only) Notice to Proceed Date: _-. .......... .......__..._- .__.._.__ ________.____......._ _______..______ -_. - -. ____-- .___._ __..___...._ -�a -� Name Signature Date Distribution Consultant, lPA —RC, State Rep.. FHWA, LPS PC, NDOR Agreements Englneer, Highway Funds Manager, CD PC DR Form 250, March 2014 EXHIBIT "B" Page 1 of 8 Version: 8 Seotember2014 Exhibit A SCOPE OF SERVICES Change of Work Order #1 for Project Name: Blair Connector Trails Project Number: ENH•89 30 Control Number: 22549 A. PROJECT DESCRIPTION This scope of services is to address the change in alignment and grades along one of the two trail sites for this project. The City received funding from FEMA to construct flood protection around its water and wastewater treatment facilities. The trail along Fairview Road as currently designed will be impacted by the flood protection and the alignment and grades need to change to coordinate with that project. The flood protection work is being designed by HDR Inc. JEO Consulting Group Inc. (Consultant) shall serve as the agent for the City of Blair (Client), representing the Client in all matters related to environmental and preliminary engineering services for this project. It is anticipated that the Change of Work Order for this project will require the following major tasks: 1. Final Design 2. Project Management and QA1QC 3. Meetings B. CLIENT SHALL PROVIDE: 1. Provide design plans and CADD files for the FEMA improvement project work. 2. Any drainage studies completed for the FEMA Project 3. Names of known utilities, addresses and permits listing use and occupancy permit data along the project. C. CONSULTANT SHALL PROVIDE: 1. Categorical Exclusion Document and Resource Reviews_ An Updated 14EPA Document is not anticipated to be required due to changes in scope. 2. Topographic Survey Additional topographic survey Is not required as part of this additional scope of work. 3. Preliminary Engineering. Design forthis change of work will be only at the final design stage. 4. Geolechnical Analysis Additional Gectechnicai information is not needed for this change in scope. 5. Meetings. Additional meetings are not included for this change in scope. 6. Final Desion, This task covers the changes needed on the Lincoln Trail Extension segment of the project to prepare the final design plans (90% & PS&E) for the project. 6.1 Convert Fairview Road PlanslDrawings This task includes converting AutoCad tiles from HDR to Microstation for use in alignment updates. 6.2 Trail Horizontal & Vertical Alignment Update This task Includes the design and drafting of the updated horizontal & vertical alignment(s). 6.3' Template Trail Cross - Sections Edit the currently developed templates as necessary to process cross sections. Project Number. ENH- 89(30) £xNbitA. CWO #1 ConSolNumber. 22549 Simi Iof2 Project Name: alair Connector Trails EXHIBIT 'B" Page 2 of 8 Versiorr. 8 September 2714 6.4 Earthwork. Process the earthwork for the updated alignment and proposed Fairview Road improvements (as provided by HDR), including any extra earthwork due to frontage roads, large driveways, and any other cause for earthwork. 6.6 Trail Geometric Design This task includes updating the geometric design of all Trail alignments, intersections, driveways, etc, for the new alignment, which includes setting up all the geometric sheets for the project and labeling. 6.6 90% Plans Address NDORIFHWA review comments from the 90% plan review for the original alignment as they pertain to the revised alignment area. 6.7 Construction and Removal Update the Removal plan sheets and Construction plan sheets with appropriate notes detailing construction and removal items related to the change in alignment. 6.8 Limits of Construction. The Consultant will define and draft the limits of construction on the plan sheets. 7. Project Management and QC. 7.1 Project Management This task includes activities to initiate and monitor project schedules, and coordinate with HDR on their final project plans. E. DELIVERABLES: 1. 90% Updated Design Plans for the Lincoln Trail 2. Hard copies of all materials and final electronic files F. SCHEDULE 1. Notice to Proceed: October 1, 2014 2. PS &E: December 1. 2014 3. Project Letting: To be determined by NDOR Project Number. ENN- 89(30) c'xhlh8 A, CWO 9f Control Number. 22549 Sheet 2 of 2 Project Name: BrarrConmclor Trails EXHIBIT "B" Page 3of8 Change of Work Order #1 Consultant Estimate of Hours projectNama: Blair Connector Trails QC Quelity C-1,o] R -iower Project Number. ENH- 89(301 see = Survey Crew Chief SCIA = Survey Crew Member Control Number. 22549 Location (aty, County): Blair, washington County Q Firm Name: JEO Consulting Gmup i Consultant project Manager. Alin Dgden PhonelEmalt 4OZ44174831ogden ®I6e.com IPA Responsible Charge: Al Schoemaker PhondEmaib 402426.4191 ar$@CZblairns,us NDDR Project Coordinator. • PhonelEmalt • _ Date Seelember 8, 2014 CLASSIFICATIONS" PM = Prajeet tdaneger SENG a Assodatel 6en:or Engineer QC Quelity C-1,o] R -iower SENV = senior Environmental Srienliat ENG = Engineer ENV = EnyuonmaMal SCranbtt SDES = Senior CesionertTeonnitlsn see = Survey Crew Chief SCIA = Survey Crew Member AOM AdminiavaWe DES = Designerlfefinician *Fat Fr*cf Manger, use one "of tie technical cfacsrLcaluns ' For User -0e6rrod Classiftalloni you swt need to edit the CtasstFc Ifons Lepeadlxa ltdaboye. To eMera new c/ass'dceuon. repbce •L10 /'v,'Ah its abb(eyialim (ex ORA) and teplacc'V— Defined 1'vnfh the a —spondng lid. (.s. Gropht A&.sp, 0rr_6 Ine uaeMefinfiens om added, Inoy 00 scN•pepulafa the Ectmale r.1 Ftoum fable, o. rreyas the nmafnmg cneafr. Consultant Independent Cost Estimate Estimele of Hours Eithbil _ EXHIBIT "B" Page 4 of 8 Change of Work Order #9 Labor Rates p,enctNamG Blair Connector Trails Project Number. ENUS1301 Co- Uoltlumber. 22549 L— tim(Cfty County): Slair Wta Nnaton Co4nty Is FM Name: JED COnrulw4a Gown CaMbn Prglrrt Manager Jule Op7en PhonelEmalk 4D2.443.74631o0dy,,*IeQ=m LPA Responclble Chatge: Al Sch.rm k., PhonalEmaik 402.426,4191 aia�ri,Wab.m.us ,,, NOOR Pwica CoorNMlor. PI— OFinaik Date: Seplemba 6, 2014 Labor Coat.: 1FW C1unReahon TAla Reors blended Rate Ameunl PM SEW Pm ed NaM er Senot Emiammudal SOenkcl 4 $56.13 S144.72 ENV SENG Em*wmnAal Sci.ntr t Ass " Senla En mtw nvuonmen Setanliet _- �_ - 0 erdetl Rain: Rnrvinn Ratn• ENO SDES Emirs Senor OesiavrrtecAdom 7 24 _ S28.59 526.60 5200.13 5640.32 DES ADM Dwimerfrawnidivi AdmnWaevo 523.50 Blerah.0 Rata 520.47 Senior esigner a moan Jaah Edrkeen Jim O'Gattnm Leu Guy aC SCC _ Out CeMrol Roticuar Sory Cm1v CNer 150% 40.0% 4560% Efia S<2.51 R SC1A Suw Crcw Member Adn*ni%4.Ue EveUn Jansa Admrd0a1iv.Ac410an1 $20.47 Stern - Rate 0—heod R.1.: 210.11% Fiaed Fee: 12.55% CLASSIFICATIONS FM = PM;V4NanaOer SENG= AsnnaaW Seri. E.Itmeer OC - OJllity Corvot Reviem4 SEW - 6rria Etrv4onmerael advelat ENO - Engineer SCC - 0uney Crew Chef ENO - Ewuw.'nUISdt.ifsl EDE$: Senor DesgnerJrrenridan SCM a SuNw CraxMember ADM - Admi isbatva DES > D.vgn,t,7.d d,m Blended Rates Worksheet EIAPLON(EE NAME STAFFING PLAN CLASSIFICATION' SALARY RA7£ %ASSICNED o ea aMger Julia Ouden Pried Nanaget 535.16 eroeD 10110% Senior Environmental Srientat nvuonmen Setanliet _- �_ - 0 erdetl Rain: Rnrvinn Ratn• A.I...tr emer E ver er�CO RNO: p w JaFe Vna Pr.lea Errginea 523.50 Blerah.0 Rata to0.0% $21.60 Senior esigner a moan Jaah Edrkeen Jim O'Gattnm Leu Guy Enariaemg Toch tlfpMemq Tech Enuna.mg T"h 531:2s 524.b0 527.00 &girded Rate• 150% 40.0% 4560% Efia DetlgneMerhglCtan lenn - H ea fiue Adn*ni%4.Ue EveUn Jansa Admrd0a1iv.Ac410an1 $20.47 Stern - Rate 180.0% Quality Comma Reviewer Troy JaMslon DC MsnaOer $42.51 Blended Rafe: 100.0% u 7 " Survey Craw Chief 6 ended Rata. Survey Craw M.mbar Dlended Reie: InpuJaeN4I enpJaye. dac4Me.lim arWrignaUdByrum. a Tefai vM Assigned'Inurl eavel 100% (of each personnel dara+OCatan oIvwV.. None Mnon in darzdrVan kut rMm as 100% lot'% Aeaigtwd•. • Consultant Independent Cost EsGmele W bor Rotes ExWbk _ EXHIBIT "B" Page 5 of 8 Change of Work Order #1 Direct Expenses Prdjecmame: Blair Connector Trails Project Number: ENH. 86(90) Control Number. 22549 Location (City, County): Blair, Washington County Finn Name: JEO Consulting Group Consultant Project Manager: Jule Ogden A PhonclEmoil: 402A43.7A9a iogdorigeo.com LPA Responsible Charge: At Schoemaker PhonelEmall: 402A26.4101 ars @d.blaicna.ut -- ND OR Project Coordinator: Phonejr=ail: Date: Septernber6,21114 Suboon5ult4ri st quantity I Unit Cost I Amount Subtotal Printing and Reproduction: Miles enraval: I Quimtky I Unit Cost I Amount Actual reasonable cost Color Copies Actual reasonable cost Miscellaneous Postage, Mailing. Dekvenes Etc. Actual reasonable cost Equipment Actual reasonable cost Privoleiy Owned Vehicle Actual rcimbursemcniamau-it to employee. not to exceed rates for company vehicles O.Snod above, Automobile Rental Actual reasonable cost Air laze Actual reasonable cost, ghing the State ao disecunis Lodging Subtotal Actual east, (excluding Imes b fees), nut to exceed federal GSA reimbursement guidelines, LodglnSIMeair: quantity Unit Cost Amount (deals Actual eosL not to exceed federal GSA reimbursement g.ridefines, currently. Miles enraval: I Quimtky I Unit Cost I Amount Actual reasonable cost Color Copies Actual reasonable cost Miscellaneous Postage, Mailing. Dekvenes Etc. Actual reasonable cost Equipment Actual reasonable cost Privoleiy Owned Vehicle Actual rcimbursemcniamau-it to employee. not to exceed rates for company vehicles O.Snod above, Automobile Rental Actual reasonable cost Air laze Actual reasonable cost, ghing the State ao disecunis Lodging Subtotal Actual east, (excluding Imes b fees), nut to exceed federal GSA reimbursement guidelines, LodglnSIMeair: quantity Unit Cost Amount (deals Actual eosL not to exceed federal GSA reimbursement g.ridefines, currently. 1 Breakfast S7.00 510.00 Lunch Subtotal Other Miscellaneous Costs, Quant Unit Cost Amount FaGities Ca hal 10.50 of Direct Labor 1 Sd.93 5483 Subtatall 5493 TOTAL DIRECT EXPENSES Slw93 Company Automobile Survey Vehicle PieValWg Standard rate AS established by me IRS, currently A1.51 Nmt Prevailing standard rite u esiabGsited by the IRS, cuneody 50.535 !mi Black and Vyhite Copies Actual reasonable cost Color Copies Actual reasonable cost Miscellaneous Postage, Mailing. Dekvenes Etc. Actual reasonable cost Equipment Actual reasonable cost Privoleiy Owned Vehicle Actual rcimbursemcniamau-it to employee. not to exceed rates for company vehicles O.Snod above, Automobile Rental Actual reasonable cost Air laze Actual reasonable cost, ghing the State ao disecunis Lodging Actual east, (excluding Imes b fees), nut to exceed federal GSA reimbursement guidelines, not to awed 677 perperson dallysintewide. not to ""ad S104 in OmahwDouglas County. (deals Actual eosL not to exceed federal GSA reimbursement g.ridefines, currently. Statewide OmahidDouglas County Breakfast S7.00 510.00 Lunch S11.03 sis.00 Dinner 52103 531.00 Incidentals 55.00 55.00 Totals $46.00 $61.00 A full fist cf rates can be found at the following website: evuw.osa oov/oerdiem Consultant Independent Cost Estimate Direct Expenses EYN bit _ EXHIBIT "B" Page 6 of 8 Change of Work Order #1 Project Cost Project Name: Blair Connector Trails Project Number, ENH-89(30) Control Number: 22549 Location IClty, Counly): Blair. Washington Counly Rrm Name: JEO Consulting Group Consultant Project Manager. Julie Ogden _ PhonerEmall: 482.443.7489 luq&mRleo cam LPA Responsible Charge: AI Schoemaker PhonorcmaiC 402.425.4191 arr @c1bla1r.na.us NDOR Project Coordinator. Phonercma8: Date: September 8, 2014 Direct Labor Costs: Nours Rate Amount Personnel Classification Frojed Manager 4 538.18 9144.72 Senior Enviranmenlal Sdemist Omer Miscellaneous Costs S4.F3 F.nvirenntental Scien ist TOTALS 50.93 Assodalbr Senior Engineer Total Pro ecl Casts: Amount Direct Labor Costs En utter 7 S2e.59 S2C0.13 Senior Desl nerrrecnrucan 24 526.68 5840 -32 Oesl nebTechn,can PROJECT COST AdmidSUaOVe 520.47 Quality Control Revimwt $12.51 Survey Crew Chlef Survai, Crew Member TOTALS 35 $985.17 Direct Expenses: Amount Subconsuliams Printing and Reomduction Costs Mika w7ravei LorlitimWMeak Omer Miscellaneous Costs S4.F3 TOTALS 50.93 Total Pro ecl Casts: Amount Direct Labor Costs S9H5.17 Ovedlead 4 219.1155 S2,09. Total Labor Costs $3,084, 67 Fixed Fee ® 12.95% S39E38 Direct Expenses 54.03 PROJECT COST 53,{8598 Consultant independent Cost Estimate Project Cost Exhibit _ EXHIBIT "B" Page 7 of 8 Change of Work Order #9 Cost by Task Project Name: Blair C onnector Trails Project Number. ENH- 89(30) Control Number. 22549 Location (City, County): Blair, Washington Cmsity Firm Name, JED Consultng Group Consultant Project Manager: Jule Ogden !i PhonoMmall: 4D2.443.7483 (ooden&eo.com LPA Responciblo Charge: At Sch PhonelEmall- 402,426,4191 ars @dbiacr,naus - -- NDOR Project Coordinator, PhonerEmail: Date: Seple 2014 DIreULabor Overhead FizedFae Total Tockc Total Hour Cost TI3.N'b 1285K project Cost For En IneeringServiees: i. Cate orieat Exclusion Document and Resource Reviews 2. Topographic Survey 3. Preliminary Engineenng 1 I 4. Geotechnical Analysis I S. Meetings 1 r, Final Design 1 4 S84Q45 S1.791D8 5338.'5 S2.96968 1 7. Pro ct Management and OC 4 51s4,72 5305.41 $55.23 5511.36 Direct Expenses .93 TOTAL 5 $955.17 S2,099.49 $396.39 $3,445.97 Consultant independent Cost Estimate Cost by Task Exhibit FXHIBIT "B" Page 8 of 8