Loading...
Checkoff Sheet MS-2014-01971.tif 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair it Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspec* tions which would Lot interfere with reroofing work, please indicate compliance with the following requirements following thin reroofing job. Property Address: _1 Contractor or Homeowner (if self) Permit #: MS-201 Installation Date: YES,-No The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (8905.2.7.1) STRUCTURAL COMPONENTS ARE S The structural* roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) EXISTING -COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) � at !gn an yre of Primary Installer Date *ignatur �Pere�ftHolder ���e:— Date