Loading...
Checkoff Sheet MS-2014-01353.tif 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF' SHEET Return to I it City Hall prior to Final Inspection 1 th S treet, B lair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this- reroofing job. Property Address: 6 r S' Contractor or Homeowner (if self) / i Permit - / _ Installation Date: YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) i ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) i STRUCTURAL COMPONENTS ARE SOUND: The structural'roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) E XISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 i 1D NOT USE RUSTED METAL OR FLASHING: Existing vent' flashing, metal edges, drain outlets, collars or metal counter - flashing were reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance = with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Si nature o Primary Installer Date � 1 Si nature of Permit Holder Date - I