Checkoff Sheet MS-2014-01353.tif 2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF' SHEET
Return to I it City Hall prior to Final Inspection
1 th S treet, B lair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this- reroofing job.
Property Address: 6 r S'
Contractor or Homeowner (if self) /
i
Permit - / _
Installation Date:
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
i
ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
i
STRUCTURAL COMPONENTS ARE SOUND: The structural'roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
E XISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
i
1D NOT USE RUSTED METAL OR FLASHING: Existing vent' flashing, metal edges,
drain outlets, collars or metal counter - flashing were reinstalled if rusted. (R907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance =
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Si nature o Primary Installer Date
� 1
Si nature of Permit Holder Date
- I