Loading...
Checkoff Sheet MS-2014-03047.tif Nov.24.2014 12:02 PM PAPILLION WINDOWS & SIDIN 4025971777 PAGE. 2/ 2 2009 INTERNATIONAL RESIDENTIAL CODE - FF CITY OF BLAIR REROOF ` j Return to Blair CHY Hall' prior to Final Inspection , 2`18 Si eP Stre Blair, HE 68008 Because of limitations caused by the infeasibility to "perform deWled Inspections which would lnterfero with rsrooflhg work, ploaae indicate oompilanoe with the following requiremente o owin thle reroofing job. Fertilt #: �.. Installation Gate:" — NO *, The materials and methods of appllcallon used for recovering or replacing the existing roof covering comply witli the requirements of'the bWIding code. (81907,1) ( 10E P ROTECTION INgaL�I-ED. An ice harrier that consists of at least two layers Of un derlayment or of a selkdhering polymer modi#led biturnan sheetw s in IGA and extends at ie st from the eaya'e ed a_ to a point of least 24 inches in a the exterior wall line of tho bullding. STRUCTURAL capable �rf scab COMPONENT8 ARE SOUND The structural roof components are ooding the roof covering system and the material and equipment loads - ,. k ,-that will 'be encountered during Jnstailation of the roof covering system, (8907,2) MISTING GO'VEl_il�i,G VVA� REMOVED., Existing roofc+overing was removed for one of the reasons required by section 8907.3 NO I USTDI] i1t1E AG, OR pLASHING ExIgng vent flashing, metal edges, drain outlets, eoifars or metal counter flashing were not reinstalled if rusted. (8907 «�) � P�# GI 3`r t.EO E : Plashing shall be reconstructed in accordance with approved manufac reto be adhered shall be L primed prior to installation, (8907.6) bituminous materials ar Signature of Prim staffer ate Sign re Q Parmet C ate I i I I