Checkoff Sheet MS-2014-03047.tif Nov.24.2014 12:02 PM PAPILLION WINDOWS & SIDIN 4025971777 PAGE. 2/ 2
2009 INTERNATIONAL RESIDENTIAL CODE -
FF CITY OF BLAIR REROOF `
j
Return to Blair CHY Hall' prior to Final Inspection ,
2`18 Si eP Stre Blair, HE 68008
Because of limitations caused by the infeasibility to "perform deWled Inspections which would
lnterfero with rsrooflhg work, ploaae indicate oompilanoe with the following requiremente
o owin thle reroofing job.
Fertilt #: �..
Installation Gate:" —
NO
*, The materials and methods of appllcallon used for recovering or replacing the existing
roof covering comply witli the requirements of'the bWIding code. (81907,1)
( 10E P ROTECTION INgaL�I-ED. An ice harrier that consists of at least two layers Of
un derlayment or of a selkdhering polymer modi#led biturnan sheetw s in IGA and
extends at ie st from the eaya'e ed a_ to a point of least 24 inches in a the exterior
wall line of tho bullding.
STRUCTURAL capable �rf scab COMPONENT8 ARE SOUND The structural roof components are
ooding the roof covering system and the material and equipment loads
-
,. k ,-that will 'be encountered during Jnstailation of the roof covering system, (8907,2)
MISTING GO'VEl_il�i,G VVA� REMOVED., Existing roofc+overing was removed for one
of the reasons required by section 8907.3
NO I USTDI] i1t1E AG, OR pLASHING ExIgng vent flashing, metal edges, drain
outlets, eoifars or metal counter flashing were not reinstalled if rusted. (8907 «�)
� P�#
GI 3`r t.EO E : Plashing shall be reconstructed in accordance
with approved manufac reto be adhered shall be L primed prior to installation, (8907.6)
bituminous materials ar
Signature of Prim staffer ate
Sign re Q Parmet C ate
I
i
I
I