Loading...
Checkoff Sheet MS-2014-03262.tif i 11/21/2014 10:20 FAX 4025332173 10002/002 Nov, 21, 2014 10:09AM CITY OF BLAIR (402, 426, 4191) i O- 5989 K 2 2`009% INTERFNA's 1 10 NAL R"'ESIDENTIAL CODE I C ITY i REROOF R eturn to lair City Hall prier to f=inal Inspection 218 S 16 Street, Blair, NE 68008 Because of limita'tiolle caused by the Infeasibility to psrfcrM deta inspections which w M Interfere with reroofing world, please Indloate compliance with the following requiremsrits following this reroofing job. Property Address: _ ) Contractor or Ho meowner (If self) permit #: M -20 1 4- Installatlon Date, /f � ��,•�,• �� - YES NO ❑ The materials and methods of application used for'recovering or replacing the existing roof covering gomply with the requirements of the building cad$. (R907.1) ❑ 105 PROTECTION INSTALLED! An lee harrier that consists of at least two layers of underlayment or of a self adhering polymer modified bitumen sheet mis Itistalleg and extends At east from the save_* edp to a at leas#_ 4 Inches inside the exterior wall line of the building. (14805.2.7.1) ' STRUCTURAL COMPONENTS A89 t'� UND:. The structural roof oomponsnts are capable of supportlrig the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (11907.2) ❑ EXISTING CC1VERlN WAS REMOVED: Existing roof covering was removed for one of the reasons required by sedUon 8907.3 DID NOT USE F TAL OR'FLASHING! Existing, vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled If rusted. (R907,6) FLASHING. INIMLLED PROPMFII_Y; Flashing shall be reconstructed in accordance � with approved manufacturer'$ Installation instruotions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (11907.6) t� Signature of Primary I er Date '^ Signature of Permit Holder — bate