Checkoff Sheet MS-2014-02478.tif To: Planning Department Page 2 of 2 2014 -11 -14 01:16:25 (GMT) 18007834876 From: Jacob Kaminski
i
..
CITY OF BLAIR REROOFING CHECKOFF SHEET,,
R eturn to B lair City t all prior to F inal Inspection
1 street, plai
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
folI0winr� this reroofing job,.
Property Add AWV
Contract or Flr�aegwner (if . s elf) a itrt5 fG't c]f a
i
Permit -2014- 2 4
Installation Date.b
NO
CT The materials and methods of application used for recovering or replacing the existing
roof covering comply with the. requirements of the building -c, .Je...(R907.1) :
ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eav!2 s i�e to a point at least 24 inches inside the exterior,
wall .line of the building. (R.905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered .during installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REMOVED. Existing roof covering was.remove.d for one.-
of the reasons required by section 1.997.3
DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets,. collars or metal counter were..not reinstalled if rusted, (R907.5)
FLASHING INSTALLED ERGRERLY Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed pricer to installation.. (8907.6) ,
Signature f Primary, Installer
Date
Sign u o ermit Helder Date
i