Loading...
Checkoff Sheet MS-2014-01684.tif i i 2009, INTERNATIONAL RIESIDENTIAL CODE CITY OF B LAIR j FI Return to Blair City Hall friar o "' al Ins ectioi 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the-Infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Property Address. Contractor or Homeowner if seI 504 Permit #.. MS -2014- 1 . 4 i Installation Date. YES NO ❑ The materials and methods of application used for recovering or replacing the existing roof, covering comply with the requirements of the building code. (R907.1) ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self4dhering polymer modified bitumen sheet was installed and extends at least f rom the' edge 'to a point at least 24 inches inside the exterior wall line of the building. (R9052.71) ❑ s'rRUCTURAL COMPONENTS ARE SOUND: The structural roof components are i capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ❑ EXISTING iCOVERINGWAS, REMOVED: Existing roof covering: was removed for one ._-._ . of the reesdns- r- 6*- ed- by- sectionR907. � _ J!�' i DID NCT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) a.. I Si nature of Primary Installer Date nature of Permit Holder Date