Checkoff Sheet MS-2014-01620.tif i
I
i
j
2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
a!
Return to Blair City Hall prior to Final Inspection
2 18 S 16 S treet,, B lair, NE 68008 �
Because of limitations caused by the Infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
fallowing this reroofing job=
Permit #. ''
�� nj (0
Installation Date:
XE NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
j underlayment or of a selfadhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE BOUND:. The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REMOVED; Existing roof covering was removed for one j
of the reasons, required by section R907.3
NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counfier flashing were not reinstalled if rusted. (R907.5)
I
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer "s installation instructions. Metal flashing to which
ous materials are to be adhered shall be primed prior to installation. (R907.6)
I
Signat e of Primary installer Dat
i
Sign ure of Permit Holder D to