Checkoff Sheet MS-2014-01144.tif i
Nov 21 2014 3:49PN No. 1397 P• 2
mmmavl%pw 4R t ■
CITY OF 13LAIR REROOFING CHECKOFF' SHEET
M1 Retdrrl t o Blair ,City ball prior to Final tnap ectioin
218 B 1 Street, Blair, N E 68008
Because of limitations caused by the Infeasibility to perform detailed Inspdctions which would
not interfere with reroofing work, please indicate compliance with the fallowing requirements
foll thin reroofing job.
Propdr#y Address: l � , V
Contractor or Homeowner (it self}:
Permit f#: IIl1S-2O14- 0
Installation Oats: 1 0 14
YES NO
+ d The materials and methods of application used for recovering or replacing the existing
i
roof covering comply with the requirements'of the .building code. (8907.1)
❑ ICE PRo rg6TI0N INSTALLED An Ice barrier that consists of at least two layers of
- Y
undorlayment or of a seifi adhering polymer modified bitumen sheet was Installed and
extends at least from the eaves edge to a point at least 24 inches Inside the exterior
wall line of the building. (89052,7.1)
❑ STR U CTURAL iCOMPONI NTS ARE -SOUND: The structural'roof components are
capable of supporting tha roof covering system and the material and equipment loads
that will be eA6ounf6red during installation of the roof covering system. (8907:2)
d EXISTiNG COVERING WAS R MOVEI], FAsting roof covering was removed for one
of the reasons required by section 8907.3 `
DID NOT USE RUSTED META OR IFLASHINC: Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were- not reinstalled if rusted. (8007,5)
I
❑ FLASHING IN5`rALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructlons. Metal flashing to which
bituminous at'erlals are to be adhered shall be primed prior to installation. (8907.6)
Signature of PrIma ato
Slgnatu of Permit Hold D ate
i