Loading...
Checkoff Sheet MS-2014-01418.tif j I RESIDENTIAL CODE 2009 INTERNATIONAL CITY OF BLAIR REROOFING Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blalr NE 6$00$ � Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following thi reroofing job. Permit #: Installation Date: / t YE�43' NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) i i ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (8905.2.7.1) I ❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are 5 capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907,2) U ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was. removed for one of the reasons required by section R907.3 i ❑ NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain i outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) j i ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.5) j Signature o Pr' ary Installer Date Signa ure of Permit Holder Data i