Checkoff Sheet MS-2014-01418.tif j
I
RESIDENTIAL CODE
2009 INTERNATIONAL
CITY OF BLAIR REROOFING
Return to Blair City Hall prior to Final Inspection
218 S 16 Street, Blalr NE 6$00$ �
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following thi reroofing job.
Permit #:
Installation Date: / t
YE�43' NO
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
i
i
❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (8905.2.7.1)
I
❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
5
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907,2)
U ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was. removed for one
of the reasons required by section R907.3
i
❑ NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
i
outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) j
i
❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.5) j
Signature o Pr' ary Installer Date
Signa ure of Permit Holder Data
i