Loading...
Checkoff Sheet MS-2014-01320.tif i Nov 20 14 09,33a Allison Blaich 402 - 933 -2995 p.2 .,...� 't a Iq i L. AAJ VP% 11 I V UVIAL KtblUtNTIAL CODE ' CITY OF BLAIR RED OF INf CHECKOFF SHE Rettiirn to Blair City Hall prior to Final Inspection 218 S 16 Street, glair, NE 68008' j Because of limitations caused by the infeasibility to-'perform detailed inspections which would riot interfere with reroofing work, please indicate compliance with the following requirements foll�w.ir�rt this job. I Property Address; Y14 IlAh o Contractor or Homeowner (if self) Permit #: MSa2014- Installation Date:2 .� YES . NO The materials and methods of application used for recovering or replacing the wdstin roof caveri . 9 comply with the requfremen #s of the building code, (8907.1) ICE PROTECTION INSTALLER: An ice barrier that consists of at least two layers of underlayment or of a self adhering polymer modified bitumen sheet was installed and extends at least from the eaye's edge to a point: at least 24 inches inside the exterior wall line of the building. (8905,2.7.1) i Q STRUCTURAL, COMP DNENT,9 ARE -SOUND: The structural' roof components are capable of supporting the roof covering system and the material and equipment roads thatwill be encountered during installation of the roof cove ring'system. (8907.2) i EXISTING COVERING WAS REMOVED; Existing roof covering was removed for one of the reasons required by section 8907.3 ❑ DiO NOT USE RUSTED METAL 'OR FLASHING: Existing venlflashing, metal edges, chain outfets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) ! FLASHING 1rilSTALLED PROPERLY. Flashing shall be reconstructed in accordance With approved manufacturer's 1nstailatfon instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Signature o P ' ri ary In taller l . Date Signature of Permit Holder Qate i I i