Checkoff Sheet MS-2014-00999.tif i
2009 INTERNATIONAL RESIPENTIAL CODE
CITY 'OF BLAIR REROOFING CHECKOFF
l
RetUm to la'rr Clay Hall prior to' Final Inspection
218 S 18 Street, Blair, NE 68008
Because of limita tions caused, by the infeasibility to perform detailed inspections which would j
not interfere with reroofing work, please indicate compliance with the following requirements
following thin reroofing job.
Property Address. �j #ttt��'
Contractor or Homeowner (if self) ; I �-. ki 9
Permit #s MS- 20'14- 0 0
0 l2Y .
Installation Date; NIP -
YES - NO
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
j
wall line of the building. (11905.2.7.1)
® STRUCTURAL COMPONENTS ARE -SOUND; The structural* roof components are
i
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
4 EXISTING COVERING WAS REMOVED; Existing roof covering was removed for one
of the reasons required by section 1190? »3 j
❑ DID NOT USE RUSTED METAL OR FLASHING; Existing vent flashing, metal edges,
i
drain outlets, collars or metal counter-fl were not reinstalled if rusted. (8907.5)
E
FLASHING INSTALLED PROPERLY; Flashihg be r� constructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8907,0)
Signatuy4 of Primary Installer Date
j
81gridture of Permit Holder Data