Loading...
Checkoff Sheet MS-2014-00999.tif i 2009 INTERNATIONAL RESIPENTIAL CODE CITY 'OF BLAIR REROOFING CHECKOFF l RetUm to la'rr Clay Hall prior to' Final Inspection 218 S 18 Street, Blair, NE 68008 Because of limita tions caused, by the infeasibility to perform detailed inspections which would j not interfere with reroofing work, please indicate compliance with the following requirements following thin reroofing job. Property Address. �j #ttt��' Contractor or Homeowner (if self) ; I �-. ki 9 Permit #s MS- 20'14- 0 0 0 l2Y . Installation Date; NIP - YES - NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior j wall line of the building. (11905.2.7.1) ® STRUCTURAL COMPONENTS ARE -SOUND; The structural* roof components are i capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) 4 EXISTING COVERING WAS REMOVED; Existing roof covering was removed for one of the reasons required by section 1190? »3 j ❑ DID NOT USE RUSTED METAL OR FLASHING; Existing vent flashing, metal edges, i drain outlets, collars or metal counter-fl were not reinstalled if rusted. (8907.5) E FLASHING INSTALLED PROPERLY; Flashihg be r� constructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907,0) Signatuy4 of Primary Installer Date j 81gridture of Permit Holder Data