Checkoff Sheet MS-2014-00816.tif 2009 INTERNATIONAL, RESIDENTIAL CODE
i
C ITY OF BLAIR REROOFIN .
Return to Blair City Hall prior to Final inspection
218 S '[8 Street, Blair, N 88008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please Indicate compliance with the following requirements
following thls� reroofing job.
Property Address:"
Contractor or Homeowner (if self)
Permit #: MS -2014-
Installation Date: - 2 D l �
YES N o
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. '(8907;1)
❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was Installed and
extends at least from the eave's edge to a point at least 24 Inches inside the exterior
wall line of the building. (8905.2.7.1)
❑ STRUCTURAL COMPONENTS ARE SOUND: The structural•roof components are
capable of supporting the roof covering system and the material and' equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
❑ EXISTING COVERING t8 AS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8947.3
❑ DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were�not reinstalled if rusted. (8.907.5)
FLASHING 'INSTALLF-D PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which .
bituminous materials are to be adhered shall be primed prior to installation. (8907.6)
� Z
r
Signs ure of Primary Installer Date
Signat of Permit Holder Date