Loading...
Checkoff Sheet MS-2014-00816.tif 2009 INTERNATIONAL, RESIDENTIAL CODE i C ITY OF BLAIR REROOFIN . Return to Blair City Hall prior to Final inspection 218 S '[8 Street, Blair, N 88008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please Indicate compliance with the following requirements following thls� reroofing job. Property Address:" Contractor or Homeowner (if self) Permit #: MS -2014- Installation Date: - 2 D l � YES N o ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. '(8907;1) ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was Installed and extends at least from the eave's edge to a point at least 24 Inches inside the exterior wall line of the building. (8905.2.7.1) ❑ STRUCTURAL COMPONENTS ARE SOUND: The structural•roof components are capable of supporting the roof covering system and the material and' equipment loads that will be encountered during installation of the roof covering system. (8907.2) ❑ EXISTING COVERING t8 AS REMOVED: Existing roof covering was removed for one of the reasons required by section 8947.3 ❑ DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were�not reinstalled if rusted. (8.907.5) FLASHING 'INSTALLF-D PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which . bituminous materials are to be adhered shall be primed prior to installation. (8907.6) � Z r Signs ure of Primary Installer Date Signat of Permit Holder Date