Loading...
Checkoff Sheet MS-2014-02886.tif I i i I .-- - �. a; z ,� II I 2009 1h i �Rf� I�� 1�,1.__ f�1=. IDI� N I AA COD CITY or BLAIR REROOFING CHECKOFF C KOFF HEET Return to Blair City Mall prior to Final Inspection 218S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would I not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job, Permit #l: _ I ►IS�� -�� "I' Q�g��O Installation Date: �) YES NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ❑ ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) ® STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907,2) ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 ® NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain ! outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (13907.6) X� Sig lure of Primary Installer Dale