Loading...
Checkoff Sheet MS-2014-02370.tif 2009 INTERNATIONAL RESIDENTIAL CODE _ � I CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the Infeasibility to perform detailed Inspections which would n_ot Interfere with reroofing work, please Indicate compliance with the following requirements following this reroofing job. Permit #: " Q& ) �A Installation Date: o YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a seff-adhering polymer modifled bitumen sheet was installed and extends at least from the eave's edge- to a point at least 24 jog bW1 We the exterior nsj_ wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND:, The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during Installation of the roof covering system. (8907.2) EXISTING COVgRING WAS agMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 No RUSIED ffgLAL QR &ASHING: Existing vent fleshing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled If rusted. (8907.5) FLASHING INSTALLED PROPERLY. Flashing shall be reconstructed In accordance with approved manutacturer's Installation Instructions. Metal flashing to which bit umnou s materials are to be adhered shall be primed prior to Installation. (8907.6) b Pr imary Instal r Date waif-,