Checkoff Sheet MS-2014-02370.tif 2009 INTERNATIONAL RESIDENTIAL CODE
_ � I
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the Infeasibility to perform detailed Inspections which would
n_ot Interfere with reroofing work, please Indicate compliance with the following requirements
following this reroofing job.
Permit #: " Q& ) �A
Installation Date: o
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a seff-adhering polymer modifled bitumen sheet was installed and
extends at least from the eave's edge- to a point at least 24 jog bW1 We the exterior
nsj_
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND:, The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during Installation of the roof covering system. (8907.2)
EXISTING COVgRING WAS agMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
No RUSIED ffgLAL QR &ASHING: Existing vent fleshing, metal edges, drain
outlets, collars or metal counter-flashing were not reinstalled If rusted. (8907.5)
FLASHING INSTALLED PROPERLY. Flashing shall be reconstructed In accordance
with approved manutacturer's Installation Instructions. Metal flashing to which
bit umnou s materials are to be adhered shall be primed prior to Installation. (8907.6)
b
Pr imary Instal r Date
waif-,