Checkoff Sheet MS-2014-02166.tif i
Nov.10.2014 01:26 PM EXTERIOR SOLUTIONS 4029329936 PAGE. 1/ 1
2009 L CODE
CITY.OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
218 S 16 Street, Blair, NE 88008
Because of limitations caused by the Infusibility to perform detailed Inspections which would
not Interfere with reroofing work, please Indicate compliance with the following requirements
following this reroofing )ob.
Property Address: W
a
Contractor or Homeowner (if self)
I
Perrnit #. MS -2014-
i
I
Installation Date: '1
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
® ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's ed-ge to a point at least 24 inches inside the exterior
wall line of the building, (R905.2.7.1)
❑ STRUCTURAL COMPONENTS AI.E SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
❑ EXISTING COVERING WAS REMOVED; Existing .roof covering was removed for one
of the reasons required by section R907.3
❑
DID NOT USE RUSTEi] METAL OR FLASHING: Existing'vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5)
❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions, Metal flashing to which
bituminous Materials are to be adhered shall be primed prior to installation. (R907,6)
Signatu a of Primary Installer Date
Signature of Permit Holder ate