Loading...
Checkoff Sheet MS-2014-02029.tif i i 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF S H EET Return to Blair City Hall pr'►or to Final Inspect`lon 2'18 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements followin this reroofing job. ! Permit #: _ ! I Installation Date: (� . I YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) Q ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet _as installedand extends at least from the rave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2,7.1) [� STRUCTURAL COMPONENTS ARE SOUND: The the material and equipment loads capable of supporting the roof covering system an that will be encountered during installation of the roof covering system. (R907.2) ® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) l a nmary Installer Date at ( of Perm' Date I ! i