Loading...
2728s.tif 2009 INTERNATIONAL RES IDENTIAL CITY OF BLAIR IN CHECKOFF SH Return to Blair City Hall prior to Final Inspection 218 S 16 th Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not Interfere with reroofing work, please indicate compliance with the following requirements To this reroofing job. --1 Permit #: i h 1c Installation Date: jo - c - " � q YE NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (11907.1) ® ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 i ❑ NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) i ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) za-�, i i Signewi of Pr' ary Installer Date j Signat g of Permit Holder Date