2728s.tif 2009 INTERNATIONAL RES IDENTIAL
CITY OF BLAIR IN CHECKOFF SH
Return to Blair City Hall prior to Final Inspection
218 S 16 th Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not Interfere with reroofing work, please indicate compliance with the following requirements
To this reroofing job. --1
Permit #:
i
h 1c
Installation Date: jo - c - " � q
YE NO
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (11907.1)
® ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
i
❑ NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
i
❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
za-�,
i
i
Signewi of Pr' ary Installer Date j
Signat g of Permit Holder Date