Checkoff Sheet MS-2014-02006.tif :SID ENTIAL ®D
�F' �►Lp►.1�. REROOFING a1 Inspection
CITY irior to Fin
Return to Blair' ,e y st reet, Blair NE, 68008
2'18 S '16
erform detailed inspections which would
the infeasibility top fiance with the following requirements
Because of limitations caused k please indicate comp
not interfere with reroofing
followin this reroofing job.
T l>
Permit #:
.0 (? -
1
installation Date:
YES
NO sed for recovering or replacing the existing
[ The materials and methods of app lication u
code. (R907.
roof covering comply with the requirements of the building
INSTALLED: An ice barrier that consists of atelt wa in stalled and
a [� ICE PROTECTLON of mer modified bitumen she ____ --- —
underlay or of a thle^eay ed e to a point
at least 2� inches inside the exfiertar
extends at lea from 8905.2.7 .
wall line of the building. ( roof ENTS ARE SOUND: components are
RAL COMPON and the aerial and equ loads
ST porting P,UGTU s stem an s stem. (8907.2)
capable of sup the roof covering y roof covering
th wlll be encountered during installation of the Y
•• G WAS REMOVED: Existing roof covering was r emoved for one
EXISTING GOVERI req uired by section R907.3
I of the reasons
• metal edges, drain
NO RUSTED METAL 10 FL eSHaNh nExisting re vent flasing, of reinstalled if rusted. (8907.5)
outlets, collars or metal counfi
LY: Flashing shall be reconstructed in accordance
Al. [� FLASHING INSTALLED PROPER ns rior to in ashing to w stallation. (8907.
with approve manufacturer' e ctions
shall installation instru. M fl
bituminous materials are to be adhered
Signature of Primary Installer
Da e
S nature of Permit Holder