Loading...
Checkoff Sheet MS-2014-02006.tif :SID ENTIAL ®D �F' �►Lp►.1�. REROOFING a1 Inspection CITY irior to Fin Return to Blair' ,e y st reet, Blair NE, 68008 2'18 S '16 erform detailed inspections which would the infeasibility top fiance with the following requirements Because of limitations caused k please indicate comp not interfere with reroofing followin this reroofing job. T l> Permit #: .0 (? - 1 installation Date: YES NO sed for recovering or replacing the existing [ The materials and methods of app lication u code. (R907. roof covering comply with the requirements of the building INSTALLED: An ice barrier that consists of atelt wa in stalled and a [� ICE PROTECTLON of mer modified bitumen she ____ --- — underlay or of a thle^eay ed e to a point at least 2� inches inside the exfiertar extends at lea from 8905.2.7 . wall line of the building. ( roof ENTS ARE SOUND: components are RAL COMPON and the aerial and equ loads ST porting P,UGTU s stem an s stem. (8907.2) capable of sup the roof covering y roof covering th wlll be encountered during installation of the Y •• G WAS REMOVED: Existing roof covering was r emoved for one EXISTING GOVERI req uired by section R907.3 I of the reasons • metal edges, drain NO RUSTED METAL 10 FL eSHaNh nExisting re vent flasing, of reinstalled if rusted. (8907.5) outlets, collars or metal counfi LY: Flashing shall be reconstructed in accordance Al. [� FLASHING INSTALLED PROPER ns rior to in ashing to w stallation. (8907. with approve manufacturer' e ctions shall installation instru. M fl bituminous materials are to be adhered Signature of Primary Installer Da e S nature of Permit Holder