Checkoff Sheet MS-2014-02577.tif i
i
RESIDEN 2009 INTERNATIONAL
CITY OF BLAIR IN CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
218 S 16 1h Street, Blair, NE 68008
i
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
Rol this reroofing Job.
Permit #: J
Installation Date:
YES' NO
® The materials and methods of application used for recovering or replacing the existing i �I
roof covering comply with the requirements of the building code. (11907.9)
CJ ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
I
underlayment or of a self-adhering polymer modified bitumen sheet was i� and
extends at least from the eave's ed4e to a point at least 24 inches inside the exterior
wall line of the building. (11905.2.71) {
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
I
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2) j
i
i
(� ® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
i
of the reasons required by section R907.3
NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
i
❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907,6)
i
S1gn&6 of P ' ary Installer Date
Signal of Permit Holder Date
I