Loading...
Checkoff Sheet MS-2014-02577.tif i i RESIDEN 2009 INTERNATIONAL CITY OF BLAIR IN CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218 S 16 1h Street, Blair, NE 68008 i Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements Rol this reroofing Job. Permit #: J Installation Date: YES' NO ® The materials and methods of application used for recovering or replacing the existing i �I roof covering comply with the requirements of the building code. (11907.9) CJ ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of I underlayment or of a self-adhering polymer modified bitumen sheet was i� and extends at least from the eave's ed4e to a point at least 24 inches inside the exterior wall line of the building. (11905.2.71) { STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are I capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) j i i (� ® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one i of the reasons required by section R907.3 NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) i ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907,6) i S1gn&6 of P ' ary Installer Date Signal of Permit Holder Date I I