Loading...
Checkoff Sheet MS-2014-01733.tif i p.2 j REROOFING 20"109" INTERNATIONAL RESIDENTIAL GODE CITY OF BLAIR . Return to Blair City Hall prior to Final Inspection 210 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspectipns which would not Interfere with reroofing work, please indicate compliance with the following requirements following this. reroofing job. Property Address: 3 Z �jclr"r'Ic� �lCr Contractor or Homeowner (if self) Permit # : S- 2014- 6V 3 3 Installation Date: 7�07�/ , YE S . NCO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements bf the building code. (8907.1) ® ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) ❑ STRUCTURAL COMPONENTS ARE SOUND: The structural'roof components are capable of supporting the roof covering system and the material and equipment loads ! that will be encountered during installation of the roof covering system. (8907.2) . ❑ EXISTING CO1J'ERING WAS REMOVED: Existing roof covering was removed for one of the reasbns required by section R907.3 ❑ DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were reinstalled if rusted. (8907.5) ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed pricrto installation. (8907.6) Signat of i Installer Date Signat f Permit Holder pate I i i i