Loading...
Checkoff Sheet MS-2014-02001.tif aD NTIAL DOD 2409 INTRN,ATION,AL � CITY OF BLAIR R!�'�OO�INO CHECKOFF SHEET Return to Blair city Hall prior to Final inspection 2'18 S 'l6 Street, Blair, NE 68008 itations caused by the infeasibility to' tons which would perform detailed inspecti Because of lime lease indicate compliance with the following requirements not interfere with reroofing work p Poll owing this reroofing job. f Permit M. I Installation Date: YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply With the requirements of the building code. (R907.1) , N INSTALLED: An ice barrier that consists of at least two taled and ICE PRO TECTIO of mer modified bitumen sheet was ___ underlayment or of a self - adhering p Y Dint at least 24 inches inside the exter1or extends at least from the R '2.71) to a p wa lin of the building. ( . 905 STRUCTURAL COMPONENTS ARE ;SOUND: The structur erial and quipm nt loads orting capable of supp roof components are the roof covering sys tem and the m covering system. (R907.2 .. that will be encountered during insta[latiori of the roof EXISTIN G COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.5 [� NO RUSTED METAL OR FLASHING, Existing vent flashing, m asted (R907. n autlefis, collars or metal counfier- flashing were not reinstalled �f r LLED PROPERLY: Flashing shall be reconstructed o in a Meta FLASHING INSTA instructions with approved manufacturer's installa be prim prior to installation. (R907.6) bituminous materials are to be adhered ate Signafiure a rimary Installer 4 L ate Signature 0 ermit Holder