Checkoff Sheet MS-2014-02001.tif aD NTIAL DOD
2409 INTRN,ATION,AL �
CITY OF BLAIR
R!�'�OO�INO CHECKOFF SHEET
Return to Blair city Hall prior to Final inspection
2'18 S 'l6 Street, Blair, NE 68008
itations caused by the infeasibility to' tons which would
perform detailed inspecti
Because of lime lease indicate compliance with the following requirements
not interfere with reroofing work p
Poll owing this reroofing job.
f
Permit M. I
Installation Date:
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply
With the requirements of the building code. (R907.1)
,
N INSTALLED: An ice barrier that consists of at least two taled and
ICE PRO TECTIO of mer modified bitumen sheet was ___
underlayment or of a self - adhering p Y Dint at least 24 inches inside the exter1or
extends at least from the R '2.71) to a p
wa lin of the building. ( . 905
STRUCTURAL COMPONENTS ARE ;SOUND: The structur erial and quipm nt loads
orting
capable of supp roof components are
the roof covering sys tem and the m
covering system. (R907.2
.. that will be encountered during insta[latiori of the roof
EXISTIN
G COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.5
[� NO RUSTED METAL OR FLASHING, Existing vent flashing, m asted (R907. n
autlefis, collars or metal counfier- flashing were not reinstalled �f r
LLED PROPERLY: Flashing shall be reconstructed o in a
Meta FLASHING INSTA instructions
with approved manufacturer's installa be prim prior to installation. (R907.6)
bituminous materials are to be adhered
ate
Signafiure a rimary Installer
4
L
ate
Signature 0 ermit Holder