Loading...
Checkoff Sheet MS-2014-00426.tif 11/05/14 10:47AM CST Blackstone Roofing, LLC - 14024264195 Pg 2/2 Nov. 4. 2014 3:34PM CITY UE BLAIR (402. 426, 4191) Na, X729 P. 2 M •I ° CORE C ITY OF BLAIR RER00FINQ T Return to 131air City Hail prior U) Final inspection 218 S 16 Street; Blair, NE 68000 Because of limitations caused by the infeasibility to perform detailed Inspectlons which would � no interfere with reroofing work, please IndloatO compliance with the following requiretnents fallowing this roroofing job, Property Address: Contractor or Homeowner (if sslf Permlt M MS -2014+ O b q z-6 Installation Date: /�`�. YE NO 0 The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building coda. (8907,1) t � P Rte BDTICN l ALLEf3: An ice barrier that consists of at least two layers of T underlayment or.'of a self- adhering polymer modified bitumen sheet was installed and extends at least from thtt a va's SdAR to , point least 24 inches RgLd the exterior Wall line of the building. (RS06.2.7.1) " " STRUCTURAL _COi1 POP 3 ARC D13N : The structural roof components are capable of the roof covering system and the material qnd equipment loads that will be encountered during Installation of the roof covering system. (11907.2) exISTING COVERING WA REMP > D: Existing roof covering was removed for one of the reasons required by section.IR907.3 DID Nt] SB P STED ME AL OR F � ASHING: Existing vent fl ashing, metal edges, drain outlets, collers or metal counter - flashing were not reinstalled if rusted. (11907.5) L FLASHING INST ALLED FIROPSRLY Fleshing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to whloh bituminous materials are to be adhered shall be primed prior to installation. (8907,6) .Signature of Primary Installer Ni Lt / r-- � Signal of Permit Holder Date .` 4