Loading...
Checkoff Sheet MS-2014-01742.tif 2009 INTERNAT RESIDENTIAL COD CITY OF BLAIR REROOFING CHECKOFF SHEET , Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this• reroofing job. A ac Property Address: L d r Contractor or Homeowner (if SA: Permit #: MS- 2014- L Installation Date: _ ,'I 0(� I YE NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements'of the building code. (R907.1) ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and 1 extends at least from the eaye's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) ❑ STRUCTURAL COMPONENTS ARE SOUND: The structural* roof components are capable of supporting the roof covering. system and the material and equipment loads that.will be encountered during installation of the roof covering* system. (R*907.2) ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R'907.3 ' DID-NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) ,e❑ ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance / with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Sig ature firnary Installer Date Date Sig ature o Permit Holder