Checkoff Sheet MS-2014-01742.tif 2009 INTERNAT RESIDENTIAL COD
CITY OF BLAIR REROOFING CHECKOFF SHEET ,
Return to Blair City Hall prior to Final Inspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this• reroofing job.
A ac Property Address: L
d
r
Contractor or Homeowner (if SA:
Permit #: MS- 2014- L
Installation Date: _ ,'I 0(� I
YE NO
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements'of the building code. (R907.1)
❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and 1
extends at least from the eaye's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
❑ STRUCTURAL COMPONENTS ARE SOUND: The structural* roof components are
capable of supporting the roof covering. system and the material and equipment loads
that.will be encountered during installation of the roof covering* system. (R*907.2)
❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R'907.3 '
DID-NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
,e❑ ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
/ with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Sig ature firnary Installer Date
Date
Sig ature o Permit Holder