Loading...
Checkoff Sheet MS-2014-01256.tif 2009 I-NTERNATIONAL RESIDENTIA CITY OF BLAIR REROOFING CHECKOFF SHEET . Return to Blair City Hall prior to Final Inspection 210 S 16 Street, Blair, NE' 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would Lot interfere with reroofing work, please indicate compliance with the following requirements following this-reroofing job. Property Address: i�(/4-/t/ Contractor or Homeowner (If self) : )IAJ Permit #: MS- 2014 - C Installation Date: r YES NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements 'of the .building code. (R907.1) ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self - adhering polyme modified bitumen sheet was installed and extends at least from the e'ave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) ❑ STRUCTURAL COMPONENTS ARE -S.OUND: The structural' roof Components are capable of supporting the roof covering. system and the material and equipment loads that.will be encountered during installation of the roof covering' system. (8907.2) ITA ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 ' I ❑ DIUNOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were- not reinstalled if rusted. (R907.5) ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Signature of r ary Installer Date Sig ature o Permit Holder Date i i i